Similar Projects
Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

Replace Utility Lines East of Memorial Student Union
Infrastructure
Bidding
$1,418,048 CJ est. value
Columbia, MO 65201

Pedestrian Bridge and Walkway at Flat Branch Park
Infrastructure
Bidding
$200,000 CJ est. value
Columbia, MO 65203

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Milling and Overlay for Columbia Streets - Multi Year
Term Contract
Post-Bid
Columbia, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Wabash Drive Extension
Infrastructure
Results
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

Warehouse and Enclosed Equipment Parking - E0176 - 1593 - City of Columbia
New Construction, Infrastructure
Design
$4,800,000 CJ est. value
Columbia, MO 65203

Hospital and Clinics Various Locations Patient Visitor Garage & Parking Structure 7 Automated Parking Guidance System
Infrastructure
Bidding
$1,010,000 CJ est. value
Columbia, MO 65203

Last Updated 03/23/2023 10:09 AM
Project Title

Forum Boulevard Improvements

Physical Address View project details and contacts
City, State (County) Columbia, MO 65203   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,345,495 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 23, 2023, a design team has been selected. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Engineering Services - Forum Boulevard Improvements Proposals received after the appointed time will be time stamped and marked as late. Late proposals will not be opened and will not be considered in the evaluation. No fax or e-mail proposals shall be accepted. The method of contractor selection has not been determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents