Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Intersection - IR 270-12.50 (at Cemetery Rd)
Infrastructure
Bidding
$1,005,000 est. value
Hilliard, OH

Intersection - FRA-IR 70-22.61 (FEF 1A)
Infrastructure
Bidding
$63,983,000 est. value
OH

2021 Street Maintenance Program
Post-Bid
Less than $1,297,000 est. value
Whitehall, OH

Street Resurfacing and Sewer System Improvements
Post-Bid
Valleyview, OH

Avery Road and Rings Road/Cara Road Interim Intersection Improvement
Results
Dublin, OH

Schiller Park Pedestrian Bridge Repair
Results
Columbus, OH 43206

Intersection - FRA-SR 3-20.40
Infrastructure
Bidding
$261,000 est. value
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Columbus Street Extension
Results
Less than $2,689,868 est. value
Grove City, OH

Four Lane Resurfacing - IR 670-00.87
Infrastructure
Bidding
$5,820,000 est. value
Columbus, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Holton Road - Jackson Pike (SR 104) and Scioto Grove Metro Park Entrance
Results
Less than $1,708,000 est. value
Grove City, OH 43123

Paving Improvement
Infrastructure
Bidding
Hilliard, OH 43026

Agler Road over Alum Creek in Mifflin Township
Infrastructure
Post-Bid
OH

Last Updated 03/30/2022 11:24 AM
Project Title

Alum Creek (Fra-Cr16-1.52), Full Closure

Physical Address View project details and contacts
City, State (County) OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,665,759
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvement of 1,364 feet of Agler Road by rehabilitating an existing bridge over Alum Creek and reducing lane widths to construct a new 10 foot shared use path along the south side of the roadway. Construct a new shared use path connection between Agler Road and the Alum Creek Multi-Use Trail (Ohio to Erie Trail).

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents