Similar Projects
Public Safety Center Construction
Addition
Conception
Patterson, CA 95363

Central Library Exterior Restoration
Renovation
Conception
$2,000,000 est. value
Pasadena, CA 91101

Council Chambers Upgrades - C11202019 - City of Petaluma
Renovation
Design
$330,000 est. value
Petaluma, CA 94952

Solar Installation at City Hall - City of Industry
Infrastructure
Design
$2,715,000 CJ est. value
City of Industry, CA 91744

RFQ/P D/B - New Ukiah Courthouse
New Construction, Infrastructure - 82,000 SF
Bidding
$136,267,000 CJ est. value
Ukiah, CA 95482

RFP Design - Electrical Design Services for City Hall and Bell Tower Regional Community Center (BTRCC) Interior LED Lighting Conversion
Renovation
Bidding
$400,000 CJ est. value
Rancho Santa Margarita, CA 92688

Fire Department City Hall Tenant Improvement
Renovation
Post-Bid
$5,000,000 est. value
Salinas, CA

Architectural Design Services of the City Hall East Wing
Renovation
Post-Bid
Whittier, CA 90602

San Clemente City Hall Council Chambers Tenant Improvement
Renovation
Results
$1,200,000 est. value
San Clemente, CA 92673

City Hall Expansion Project
Renovation
Results
Calimesa, CA 92320

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Gas Station, Car Wash, Convenience Store
New Construction - 8,262 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Napa, CA 94559

City Hall East Wing Remodel - C11202226 - City of Petaluma
Renovation - 240 SF
Pending Verification
$30,000 CJ est. value
Petaluma, CA 94952

Hale Building Interior Remodel
Renovation
Conception
$3,500,000 est. value
Pasadena, CA 91101

Sierra County Courthouse Generator Replacement
Renovation
Design
$300,000 CJ est. value
Alleghany, CA 95910

Last Updated 03/31/2023 08:04 AM
Project Title

City Hall Refurbishment And Safety Project: Phase 3

Physical Address View project details and contacts
City, State (County) Laguna Woods, CA 92637   (Orange County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $115,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done includes, but is not limited to, the construction of a new break room/lactation room, installation of a hard lid in an office, and soundproofing a wall. All work occurs within the existing Laguna Woods City Hall building. The City's construction cost estimate is $115,000. The City of Laguna Woods is requesting bids from qualified bidders - including Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantaged Business Enterprise (DBE), Disabled Veterans Business Enterprise (DVBE), Small Business Enterprise (SBE) and Section 3 license contractors and suppliers - for its "City Hall Refurbishment & Safety Project: Phase 3." The Contractor must have a B - General Building Contractor License in good standing at time of contract award and maintain such in full force and effect for the entire duration of the Contract. No award will be made to a contractor who has not been licensed in accordance with the provisions of the California Business and Professions Code. Please note that this project also requires the Contractor or subcontractor(s) to possess the following licenses, or other licenses that allow for the work to be lawfully completed: C-5 (Framing and Rough Carpentry Contractor), C-9 (Drywall Contractor), C-10 (Electrical Contractor), C-20 (Warm-Air Heating, Ventilating and Air-Conditioning Contractor), C-33 (Painting and Decorating Contractor), C-36 (Plumbing Contractor), and C-61 (D-28 Doors, Gates and Activating Devices). Prevailing Wage Requirements - In accordance with the provisions of Section 1770 et seq., of the Labor Code, the Director of Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770,1773,1773.1" Department of Industrial Relations Registration Requirement - No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No bid will be considered unless it is made on a proposal form furnished by the City of Laguna Woods. All proposals and bids shall be accompanied by cash, a certified bank draft, or a bond, from an accredited surety company, all clearly payable to the City of Laguna Woods for an amount not less than 10% of the bid submitted. The bid security will be declared forfeited if the successful bidder refuses or fails to enter into a contract within 10 days following receipt of the Notice of Award with the contract documents. The successful bidder is required to furnish a Labor and Materials Bond in an amount that is one hundred (100%) of the contract and a Faithful Performance Bond in an amount equal to 100% of the contract; the bonds to be secured by a surety company or surety companies satisfactory to the City Attorney of the City of Laguna Woods. The City of Laguna Woods reserves the right to reject any or all bids, to waive any informalities on a bid, and to make awards in the best interest of the City of Laguna Woods. It is the intention of the City to comply with the Americans with Disabilities Act. If you need assistance to participate in the bid opening, please contact either the City Clerk's Office at (949) 639-0500/TTY (949) 639-0535 or the California Relay Service at (800) 735-2929/TTY (800) 735-2922. The City requests at least two business days' notice in order to effectively facilitate the provision of reasonable accommodations. General Description of Work The work to be done includes, but is not limited to, the construction of a new break room/lactation room, installation of a hard lid in an office, and soundproofing a wall. All work occurs within the existing Laguna Woods City Hall building.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents