Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Sr 1003 - Brady Twp Line To Sr 1001
Alteration
Design
$2,899,132 est. value

Route 248 Realignment
Alteration
Design
$6,192,415 est. value
Bath, PA 18014

Church Road and East Walker Road Culverts Replacement Project
Infrastructure
Bidding
$200,000 CJ est. value
Moore Township, PA 18014

Church Road and East Walker Road Culverts Replacement Project
Infrastructure
Bidding
$200,000 CJ est. value
Moore Township, PA 18014

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Bituminous Asphalt Materials
Post-Bid
Nazareth, PA

Bituminous Pavement Overlay
Post-Bid
Wind Gap, PA 18091

Township Line Road Full Depth Reclamation and Paving Project
Results
Bethlehem, PA 18015

SR 512 Resurface S Main St to SR 611
Results
$1,000,000 to $2,499,999 est. value
Bangor, PA

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

Broad Street Mixed Use Building
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bethlehem, PA 18018

Broad Street Mixed Use Building
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bethlehem, PA 18018

Newburg Road (SR 3020) o/Tri
Infrastructure
Design
Less than $4,152,275 est. value
Nazareth, PA 18064

Easton Road Ballfield Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Lower Saucon Township, PA 18015

Last Updated 07/28/2022 05:31 PM
Project Title

2022 44 Trench Restoration

Physical Address View project details and contacts
City, State (County) Bethlehem, PA 18018   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For 2022 44 Trench Restoration CLARIFICATION DEADLINE 7/19/2022 4:00 PM The City of Bethlehem encourages women and minority businesses to bid on City jobs. The Work will be substantially completed within 60 days after the date when the Contract Times commence to run The Work will be substantially completed within 60 days after the date when the Contract Times commence to run

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents