Similar Projects
East River Drive Pavement Overlay
Infrastructure
Bidding
Nichols, NY

Ballard Road Repairs
Post-Bid
Middletown, NY 10941

Downtown Mill and Pave Salina and State Streets
Post-Bid
Syracuse, NY 13202

Maybrook Bikeway II - Pin 8756.84 - Phase A - ALT 1 and Pin 8761.05 - Phase B
Results
Brewster, Southeast, NY 10509

Asphalt Concrete Milling and Resurfacing and Cold Recycling Asphalt Concrete
Results
Queensbury, NY 12801

Summer Highway Maintenance
Term Contract
Post-Bid
Buffalo, NY 14202

Sitterly Road at Woodin Road and Crossing Boulevard Intersection Improvement
Results
Clifton Park, NY

Rehabilitation of Hudson Street Over Paintbed Brook
Post-Bid
North Creek, NY 12853

Asphalt Concrete Milling and Resurfacing on Route 22
Results
NY

Asphalt Milling
Term Contract
Post-Bid
Elizabethtown, NY 12932

Mill and Resurfacing with ADA Curb Ramps and Drainage Improvements
Results
Less than $5,000,000 est. value
Hamburg, Lackawanna, NY 14075

Reclamation
Term Contract
Post-Bid
Elizabethtown, NY 12932

Asphalt Concrete Milling and Resurfacing
Results
Less than $2,600,000 est. value
Sodus, Williamson, NY 14589

Road Work for 2020
Post-Bid
Gouverneur, NY 13642

Harsh Winter Paving: Routes 202 And 306
Results
Haverstraw, Ramapo, NY 10901

Reported 07/13/2021 12:00 AM
Project Title

Cold Mill and Overlay 5th Street - 2021

Physical Address View project details and contacts
City, State (County) Jamestown, NY 14701   (Chautauqua County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of milling and paving a portion of 5th Street including modifying and constructing concrete structures such as curbs, gutters, brick pavement, sidewalks, handicapped ramps and driveway aprons within the City of Jamestown. Location : The work will be located on 5th Street from Washington Street to Prendergast Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents