Similar Projects
Plumbing Supplyhouse
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

Residential Plumbing
Alteration
Post-Bid
$10,000 est. value
Barrington, IL

Piping Insulation and Lighting Replacement at Tefft Middle School
Alteration
Results
Streamwood, IL 60107

South Fire Station Bunk Room, Locker Room and Restroom
Renovation
Results
Oak Park, IL 60304

Industrial Arts Renovation - Bid Package 22A- Plumbing Bid Package 23A- HVAC Bid Package 26A- Electrical
Alteration
Post-Bid
$600,000 est. value
Burbank, IL 60459

Renovate Residences Plumbing - Remod & Rehab
Alteration
Results
Less than $250,000 est. value
Park Forest, IL 60466

Furnish and Deliver Plumbing Pipe, Fittings and Valves to Various Locations for a One-year Period
Term Contract
Post-Bid
$466,500 est. value
Chicago, IL

Public Works Center Plumbing Repairs
Alteration
Results
Oak Park, IL

Replace Piping and Storm Sewer Pumps
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Chicago, IL 60640

Construction Services for Millennium Station Boiler Replacement
Renovation
Results
$698,000 CJ est. value
Chicago, IL 60601

Watts Plumbing Supplies
Term Contract
Post-Bid
Chicago, IL 60604

Lilac Avenue and Maclean Court Roadway and Utility Improvement
Infrastructure
Results
$1,969,485 CJ est. value
Glenview, IL 60026

Plumbing Supplies
Term Contract
Post-Bid
Maywood, IL 60153

New Field Domestic Water Pump
Renovation
Results
$57,750 CJ est. value
Chicago, IL 60626

Lead Water Service Replacements
Infrastructure
Post-Bid
$400,000 CJ est. value
Calumet City, IL 60409

Last Updated 09/18/2023 02:13 PM
Project Title

Rebid - Replace Piping And Storm Sewer Pumps

Physical Address View project details and contacts
City, State (County) Chicago, IL 60640   (Cook County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,504,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: The scope of work provides for the replacement of the existing storm water pumps, storm and sanitary and domestic distribution piping within the building and general trade work. The Contractor shall furnish a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, in accordance with the Public Construction Bond Act (30 ILCS 550). Each bond shall be in the full amount of the contract on forms provided by CDB and executed by a surety acceptable to CDB. Single Prime Delivery Method Projects. When licensure and/or certification is required for an identified trade, the identified protected subcontractors or the Prime Bidder, if self-performing the work, shall be properly licensed and certified at the time of bid to perform the work for the identified trade. GOALS: The participation goal percentages on the amount of the contract awarded by CDB for this project are: 25% MBE, 5% WBE, 3% VBE/PBE. CDB's Rights. When, in its opinion, it is in the best interest of the State, CDB reserves the right to: CDB - 01 11 01 JANUARY 2023 11 CDB Project No. 810-010-007 A. Accept any bid B. Reject any or all bids C. Waive technical deficiencies and irregularities D. Allow bidder to remedy technical deficiencies or irregularities within a stated time E. Rescind any notice of award if CDB determines the notice of award was issued in error F. Rescind any notice of award when it is in the best interest of the State G. Rebid any contract

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents