Similar Projects
Aircraft Storage Hangar
Post-Bid
Mount Airy, NC 27030

T-Hangar and Taxilane Elkin Municipal Airport
Post-Bid
Elkin, NC 28621

Two Corporate Hangars - Johnston Regional Airport Smithfield
Results
Smithfield, NC

C-17 Corrosion Control and Fuel Cell Hangar
New Construction
Results
$25,000,000 to $30,000,000 est. value
Charlotte, NC 28208

P199 Design-Build Aircraft Maintenance Hangar and P235 Design-Bid-Build Flightline Utility Modernization, Marine Corps Air Station, Cherry Point, North Carolina
Construction
$100,000,000 to $250,000,000 est. value
Cherry Point, Havelock, NC 28532

North Ramp Hangar N1
Construction
Hickory, NC 28601

10-Unit T-Hangar Project
Post-Bid
New Bern, NC

T-Hangar Area Development Duplin County Airport
Results
Kenansville, NC

Michael J Smith Airport Hurricane Repairs
Post-Bid
NC 28570

Construct T-Hangar, Taxilanes and Access Road Project
Results
Cary, NC

Beaufort Airport Siding Repair Project
Post-Bid
Beaufort, NC

T-Hangar and Taxilane Phase I
Results
Less than $3,117,767 est. value
Elm City, NC

Corporate Hangar Project
Results
Goldsboro, NC 27530

New Corporate Hangar Project
Results
Oak Island, NC

T-Hangar and Taxilane Development
Results
North Wilkesboro, NC 28659

Last Updated 09/17/2019 09:23 AM
Project Title

Michael J Smith Airport Hanger 19 Renovation

Physical Address View project details and contacts
City, State (County) Beaufort, NC 28516   (Carteret County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor shall be responsible for any and all plumbing, electrical and structural concerns while preforming work. All new wall insulation shall be R-13 and all new ceiling insulation shall be R-19. All walls on first and second story shall be primed with Zinsser Mold Killing multi-purpose waterbased primer. The Contractor shall match the current finish paint and apply the same color and sheen after the primer. The Contractor shall replace all carpet and padding with new padding and Mohawk Home and Office Aladdin (12ft) Berber/loop interior carpet. The Contractor shall ensure that all HVAC ducts in ceilings are connected while work is being performed. The Contractor shall scrap and reseal all interior windows with a silicon caulk. The Contractor shall clean all carpet, windows, desk, furniture and lighting fixtures after construction completion. SDS for all materials must be submitted to County prior to any work being performed. The Contractor shall dispose of all materials associated with this particular project to the nearest County landfill.
Details
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents