Similar Projects
Last Updated | 12/04/2021 01:08 AM |
Project Title | 4700 South 4000 West to 5600 West |
Physical Address | View project details and contacts |
City, State (County) | UT (Salt Lake County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project Consists of Just Under Two Miles of Roadway Reconstruction in a Residential and Commercial Urban Environment. The Scope includes Reconstruction of Pavement, Curb, Gutter, Pedestrian Ramps, and Sidewalk throughout the Corridor. The Project will Widen the Road Between 4800 West And 4000 West to Accommodate a Five-Lane Section with Bike Lanes. The Existing Bridge over the Utah & Salt Lake Canal will be Removed and Replaced with a Cast-In-Place Box Culvert. The Project will also Reconstruct Traffic Signals, Construct a Large Drainage Trunk Line, and Replace Water Lines in Cooperation with Granger Hunter Improvement District. Streetlights and Trees will be Built (Placed) in Portions of the Park Strip, along with Various Segments of Privacy - Retaining Wall Construction Behind the Sidewalk. It is Anticipated that the Project will Begin Construction on the Box Culvert in Late 2021/Early 2022 with the Remainder of the Work Being Complete in the 2022 Construction Season. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |