Similar Projects
Nano Filtration Addition at the RIM Plant and Additional Well Field Reserve - City of Battle Creek
Renovation
Conception
$18,200,000 CJ est. value
Battle Creek, MI 49037

Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

Educational Center Playground Improvements
Infrastructure
Design
$60,000 CJ est. value
Saint Johns, MI 48879

Jackson Street Parking Lot Reconstruction - City of Battle Creek
Infrastructure
Design
$1,000,000 CJ est. value
Battle Creek, MI 49037

Howard Family Trail Bridge Repair 2022
Infrastructure
Bidding
$400,000 CJ est. value
Saint Joseph, MI 49085

Dowagiac Union High School Track and Athletic Field Improvement Project
Infrastructure
Bidding
$500,000 CJ est. value
Dowagiac, MI 49047

Lagoon Transfer Valve Repair Services
Renovation
Post-Bid
Allegan, MI

Michigan Sugar Company: Pulp Loading Slab Project
Infrastructure
Post-Bid
Bay City, MI 48706

WWTP Clarifiers Rehabilitation, Contract 2, Construction and Installation
Results
Marshall, MI 49068

Wastewater System Improvements - Lift Station Nos. 51, 52, & 53
Renovation
Results
New Buffalo, MI

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

Straits of Mackinac Tunnel Construction - Great Lakes 5 Pipeline Replacement
Infrastructure
Pending Verification
$500,000,000 CJ est. value
Mackinaw City, MI 49701

Hydro Aluminium Recycling Plant
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Cassopolis, MI 49031

South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Last Updated 10/06/2022 02:15 PM
Project Title

RFQ D/B - Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Belding, MI 48809   (Ionia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Accepting Qualifications, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Belding is soliciting Statements of Qualifications (SOQ) from qualified progressive design/build teams (D/B) to complete the design, permitting, and construction of the proposed Wastewater System Improvements. The intent of this Request for Qualifications (RFQ) is to determine the best firm through a Quali- fications Based Selection Process (QBS) to deliver comprehens- ive progressive design/build" services as defined by the Michigan Department of Environment, Great Lakes and Energy (EGLE) un- der the Clean Water State Revolving Fund (CWSRF) loan pro- gram's project delivery methods. The Wastewater System Improvements project is comprised of the following: Wastewater treatment plant (WWTP) improvements including: The construction of a new mechanical WWTP and decommission- ing of the existing lagoon facilities. Preliminary concepts for the mechanical WWTP include construction of a new headworks building with influent flow metering, screening, and grit removal, biological treatment process, final clarifiers, ultraviolet (UV) disin- fection system, and a solids handling system. Site improvements include a new process building, site piping, and renovation of the existing Laboratory/Administration building. Collection system and pump station improvements including: Gravity sewer spot repairs and cured in place pipe (CIPP) lining, manhole lining and replacement at select locations. Pump station telemetry improvements and select forcemain replacements. If you have any questions regarding this RFQ, please direct them via email to the City Manager jstoppels@ci.belding.mi.us

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents