Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

Advance Notice - FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Design
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Taxiway C Rehabilitation
Infrastructure
Bidding
Less than $2,280,000 est. value
New Smyrna Beach, FL

Replace Runway 18-36 Edge Lighting, Signs, REILs, Wind Cone, And PAPIs
Infrastructure
Bidding
Hilliard, FL 32046

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Part 139 Airfield Improvements
Infrastructure
Bidding
Tampa, FL 33607

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Peter Prince Field Taxiway A Rehabilitation
Infrastructure
Bidding
Milton, FL 32583

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

HWO Dual Taxilane Access to Taxiway L
Infrastructure
Bidding
Fort Lauderdale, FL

Last Updated 06/07/2021 03:23 PM
Project Title

Construction of Runway 1-19 Rehabilitation and Extension

Physical Address View project details and contacts
City, State (County) Umatilla, FL 32784   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The rehabilitation of the existing Runway 1-19 (published length 2500 feet and width of 60 feet) and the construction of a 375 foot runway extension at the Umatilla Municipal Airport. The parallel taxiway will extend to the north as well to provide access to the proposed runway end. Also included in this project is clearing and grubbing, site grading, airfield electrical, airport navigational aids, and site restoration.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents