Similar Projects
Last Updated 04/10/2019 05:50 AM
Project Title

FDP, Thin Overlay Surf D

Physical Address View project details and contacts
City, State (County) (Berkeley, Charleston, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 5613761, 5613760, P032158, P032170, P032209 Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Csx Railroad Insurance And Flagging 001 1.000 Ls Maintenance Stone 38.950 Ton Full Depth Asph. Pav. Patching 6" Unif. 3,895.000 Sy Micro Surfacing Surface Course 214,366.600 Sy Permanent Construction Signs (Ground Mounted) 324.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 590.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 58,200.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 200.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 1,002.000 Lf 12" White Solid Lines - Perm.Pvmt.Markings 126.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 76.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 1,152.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 21.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 9.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 5.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 8.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 5,400.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 110,020.000 Lf 24" Yellow Solid Lines - Perm.Pvmt.Marking 40.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 1,180.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 116,280.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 400.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,974.000 Lf 12" White Solid Lines - Fast Dry Paint 252.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,294.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 38.000 Ea White Word Message "Only"-Fast Dry Paint 18.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 10.000 Ea Railroad Crossing Symbols - Fast Dry Paint 16.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 10,800.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 219,490.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 270.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 52.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 40.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,147.000 Ea Surface Applied Detectable Warning 10.000 Sf
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents