Similar Projects
I-70 Picadilly Design Build
Infrastructure
Bidding
Aurora, CO 80040

2022 Slurry Seal
Infrastructure
Bidding
$400,000 est. value
Englewood, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Resurfacing and Drainage, Signing, Striping, and Curb and Cutter
Results
$1,000,000 to $5,000,000 est. value
CO

2021 Roadway Improvements Project
Infrastructure
Post-Bid
Bow Mar, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Construction Debris, Solid Waste
Infrastructure
Post-Bid
Littleton, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Hot Mix Asphalt Fci Englewood
Term Contract
Post-Bid
Englewood, CO

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

SH83, E-470 to Arapahoe Road
Results
$5,000,000 to $20,000,000 est. value
Centennial, CO

Construction of the Filing 10, Filing 11, and Fultendale St. Roadways
Infrastructure
Post-Bid
Aurora, CO 80040

Reported 05/26/2022 12:00 AM
Project Title

Smoky Hill and Buckley Intersection Improvements

Physical Address View project details and contacts
City, State (County) Aurora, CO 80015   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Smoky Hill & Buckley Intersection Improvement project consists of performing work including but not limited to the following: Addition of double-left turn lanes from E. Smoky Hill Road onto S. Buckley Road in both directions; Addition of right-turn lane from southbound S. Buckley Road to E. Smoky Hill Road; Reconstructing curb ramps; Signing and striping; Landscape and irrigation restoration; and Traffic signal relocation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents