Similar Projects
Transit Headquarters - Summit County Transit Department
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Frisco, CO 80443

Element Hotel / Silverthorne
New Construction, Infrastructure - 98,500 SF
Design
$29,000,000 CJ est. value
Silverthorne, CO 80498

Element Hotel / Silverthorne
New Construction, Infrastructure - 98,500 SF
Design
$29,000,000 CJ est. value
Silverthorne, CO 80498

EJMT Service Area Repairs-Various Paving, Guardrail Improvements, and Masonry Improvements
Infrastructure
Bidding
$20,000,000 CJ est. value
Dillon, CO 80435

EJMT Service Area Repairs-Various Paving, Guardrail Improvements, and Masonry Improvements
Infrastructure
Bidding
$20,000,000 CJ est. value
Dillon, CO 80435

4th Street North Apartments
New Construction, Infrastructure - 51,620 SF
Sub-Bidding
$10,000,000 CJ est. value
Silverthorne, CO 80498

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mesa Cortina 2021 Water Line Replacement
Results
Silverthorne, CO 80498

Silverthorne Early Child Care Facility
New Construction, Infrastructure
Construction
$8,500,000 CJ est. value
Silverthorne, CO 80498

Galena Street / Multi-Family Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Frisco, CO 80443

Silverthorne Vet Clinic
New Construction, Infrastructure
Pending Verification
$3,200,000 CJ est. value
Silverthorne, CO 80498

West Main Street Mixed Use
New Construction, Infrastructure - 88,932 SF
Design
$15,000,000 CJ est. value
Frisco, CO 80443

Granite Street Workforce Housing / City of Frisco
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Frisco, CO 80443

Last Updated 02/07/2023 08:06 AM
Project Title

Minor Rehabilitation and Chip Seal

Physical Address View project details and contacts
City, State (County) Silverthorne, CO 80498   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $6,632,330 [brand] Estimate
Plans Available from Civil Engineer - 12/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

Region: 3 Counties: Grand, Summit Projects: STR0092-024 UDBE Goal: 6.50% 009d Mp 106 To114 Summit County Minor Rehabilitation; 009d Mp 125 to 138 Grand County Chip Seal. This project includes two sections of highway along SH 009D, designated Site 1 and Site 2. Site 1: SH 9 Project Limits 106 to 114: Located in Summit County, just north of Silverthorne, CO. Site 1 project scope includes resurfacing with 1.5 in of HMA over the existing roadway surface and accesses to the state highway along MM 107 to 113, guardrail updates along the project length, and milling and filling 150 ft at each end of the resurfacing work. Additional milling and overlay in specific areas for designated drainage and profile corrections as noted in the plans. The work also includes repair of rilled slopes, striping, signing, shouldering, and temporary traffic control work. Site 2: SH 9 Project Limits 125 to 138: Located in Grand County, just south of Kremmling, CO, this portion of SH 9 is a two lane highway with various residential accesses and wildlife crossings. Site 2 project scope includes a full width chip seal and fog coat from MM 126 to 137. The work also includes striping, signing, and minor milling and shouldering at locations where the shoulder material has eroded, and temporary traffic control work. Additional milling and overlay will in specific areas for designated drainage and profile corrections as noted in the plans. The project will also include the installation of riprap rundowns and structure signs as well as temporary traffic control during construction and restriping after the chip seal is complete. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 002 - Minor Rehabilitation and Chip Seal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents