Similar Projects
Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$6,500,000 est. value
Prescott Valley, AZ 86314

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Chip Seal (Fall, FY 22-23)
Infrastructure
Bidding
$1,100,000 est. value
Ash Fork, Bagdad, Camp Verde, Cornville, Hillside, Seligman, Wickenburg, AZ

Pavement Marking In Yavapai County, Arizona
Infrastructure
Bidding
$2,000,000 est. value
Prescott, AZ

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Viewpoint Drive/Pronghorn Ranch Parkway Intersection Improvement Project
Results
Prescott Valley, AZ

Chip Seal Summer FY 2020-2021
Results
$1,012,400 est. value
Prescott, AZ

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Construction Management at Risk (CMAR) FY21 Pavement Preservation Project
Results
$750,000 est. value
Prescott, AZ 86301

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Hot Melt Crack Seal Program Fiscal Year 2020/2021 Project
Results
Prescott Valley, AZ

Rubberized Chip Seal Pavement Preservation
Infrastructure
Post-Bid
$3,132,345 est. value
Prescott, AZ

System Preservation (Engineering)
Results
Less than $5,200,000 est. value
AZ

FY 21/22 Chip Sealing of Area 3 and Salt Mine Road
Infrastructure
Post-Bid
Camp Verde, AZ 86322

Last Updated 06/24/2022 06:26 AM
Project Title

Manzanita Trail Overlay FY 21-22

Physical Address View project details and contacts
City, State (County) Dewey, AZ 86327   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $628,420
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a 2" fiber reinforced asphaltic concrete overlay on Manzanita Trail from Prescott Country Club Boulevard to Turquoise Circle. The total project length is 5,835 feet with approximately 2,523 tons of fiber reinforced asphaltic concrete pavement, 1/2 " high traffic with PG 64-22 binder. Other associated work includes: application of 3,088 gallon of bituminous tack coat; 556 square yards pavement removal and replacement with geogrid; 11,536 linear feet of shoulder build-up and grading; placement of 400 tons shoulder material; adjusting 33 water valve box frames and 1 manhole frame; re-establish pavement marking.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents