Similar Projects
Last Updated | 06/24/2022 06:26 AM |
Project Title | Manzanita Trail Overlay FY 21-22 |
Physical Address | View project details and contacts |
City, State (County) | Dewey, AZ 86327 (Yavapai County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $628,420 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a 2" fiber reinforced asphaltic concrete overlay on Manzanita Trail from Prescott Country Club Boulevard to Turquoise Circle. The total project length is 5,835 feet with approximately 2,523 tons of fiber reinforced asphaltic concrete pavement, 1/2 " high traffic with PG 64-22 binder. Other associated work includes: application of 3,088 gallon of bituminous tack coat; 556 square yards pavement removal and replacement with geogrid; 11,536 linear feet of shoulder build-up and grading; placement of 400 tons shoulder material; adjusting 33 water valve box frames and 1 manhole frame; re-establish pavement marking. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |