Similar Projects
Campbell Middle School Flooring Replacement
Post-Bid
Smyrna, GA 30080

Roybal Flooring Replacement
Results
$1,000,000 to $5,000,000 est. value
Atlanta, GA

Carpet, Carpet Tile Installation and Repair Services
Term Contract
Results
Atlanta, GA

Carpet Annual Contract
Post-Bid
Columbus, GA

Keheley Elementary School Flooring Replacement
Post-Bid
Marietta, GA 30066

Riverside Elementary School Flooring Replacement
Post-Bid
Kennesaw, GA

Palmer Middle School Flooring Replacement
Post-Bid
Kennesaw, GA 30144

Hardwood Synthetic Sports Flooring
Post-Bid

LVT and Carpet Replacement Installation at Marietta Fire Department Station #51
Post-Bid
Marietta, GA 30061

Bus Lift Remanufacturing And Floor Coating
Post-Bid
Atlanta, GA 30301

Gym Flooring for Lindley MS
Post-Bid
Mableton, GA 30126

Annual Contract - Purchase and Installation of Flooring
Term Contract
Results
Marietta, GA 30060

Lindley 6th Grade Academy Flooring Replacement
Post-Bid
Mableton, GA 30126

South Cobb High school Gym Floor Replacement
Post-Bid
Austell, GA 30106

Carpet and Flooring Installation
Post-Bid
Atlanta, GA

Reported 02/12/2020 12:00 AM
Project Title

Kincaid Elementary School Flooring Replacement

Physical Address View project details and contacts
City, State (County) Marietta, GA 30066   (Cobb County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to, the demolition of the existing finish flooring and base material including Vinyl Composite Tile (VCT) and Carpet. Testing for relative humidity, the preparation of existing floor substrate, application of leveling compound, application of adhesives and installation of new Luxury Vinyl Tile (LVT), Tile Carpeting, and base material including transition strips and accessories. In addition, an add alternate will be submitted and reviewed by the Owner to correct the existing buckling occurring in the gym flooring system.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents