Similar Projects
Greulich' s Automotive
New Construction - 5,618 SF
Design
$800,000 est. value
Glendale, AZ 85308

QuikTrip #1437
New Construction - 5,744 SF
Design
Mesa, AZ 85212

Fry's Food Store #693-02 - Fuel Center
New Construction
Post-Bid
Queen Creek, AZ 85142

Speedway #101195
New Construction - 7,691 SF
Post-Bid
Gilbert, AZ 85297

Silos Auto Sales
New Construction - 16,000 SF
Construction
$18,800 est. value
Gilbert, AZ 85295

QuikTrip #1402
New Construction - 7,300 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Phoenix, AZ 85048

Carvana Restoration And Storage Yard
New Construction
Pending Verification
Surprise, AZ 85379

All Trucks Auto Parts
New Construction - 1,152 SF
Pending Verification
Phoenix, AZ

Buckeye Fuel Station and Equipment Services
Addition
Design
AZ 85326

Earnhardt Honda
Renovation - 11,598 SF
Post-Bid
Avondale, AZ 85323

Carvana - Customer Center
New Construction - 5,790 SF
Construction
$1,349,017 est. value
Glendale, AZ 85308

Circle K Convenience Store
New Construction, Demolition - 5,200 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Peoria, AZ 85345

Circle K
New Construction - 10,358 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Chandler Heights, AZ 85142

AutoNation Scottsdale Subaru
New Construction, Demolition - 29,475 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Scottsdale, AZ 85260

Caliber Collision
New Construction - 17,456 SF
Construction
$1,522,874 est. value
Phoenix, AZ 85085

Reported 05/25/2022 12:00 AM
Project Title

Buckeye Fuel Station and Equipment Services

Physical Address View project details and contacts
City, State (County) Buckeye, AZ 85396   (Maricopa County)
Category(s) Commercial
Sub-Category(s) Gas Station, Vehicle Sales/Service
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a new four bay vehicle maintenance building, fuel island, vehicle wash bay and associated site work at the existing MCDOT Buckeye Service Facility.

Details

Gas Station, New Construction, Vehicle Sales/Service, New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents