Similar Projects
South Campus Weed Plaza Improvements
Alteration
Bidding
$175,000 est. value
Lowell, MA 01854

Valley Tennis Court Resurfacing Project
New Construction, Infrastructure
Bidding
Less than $30,000 est. value
Lexington, MA

Walsh Field Improvement
Post-Bid
$570,000 est. value
Framingham, MA 01702

Park Improvements for Gertrude Spaulding Park
Post-Bid
Less than $150,000 est. value
Wakefield, MA 01880

Tennis Court Replacement at War Memorial Recreation Center
Results
$435,000 est. value
Cambridge, MA 02138

Ferryway Tot Lot Surfacing
Results
$65,000 est. value
Malden, MA

Mary Cummings Park Improvements
Renovation
Construction
$400,000 est. value
Burlington, MA 01803

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Design and Installation of an Outdoor Educational Challenge Course
New Construction
Bidding
Marlborough, MA 01752

Manchester Field 400M Running Track Repair and Resurfacing Project
Post-Bid
Less than $135,000 est. value
Winchester, MA 01890

Cold Spring Park - Life Course Trail Renovation
Results
$65,000 est. value
Newton, MA

Pocket Park Improvement and Maintenance of Cobble Traffic Islands
Post-Bid
$25,000 est. value
Lincoln, MA

Bocce Court Installations - Saltonstall Building
Results
Less than $58,000 est. value
Medford, MA 02155

Ronan McElligott Playground Safety Surfacing
Post-Bid
Westford, MA

Infield Renovations Monsignor McCabe Playground and Nipper Maher Park
Results
Waltham, MA

Reported 06/03/2021 12:00 AM
Project Title

Repair and Resurface Existing Track

Physical Address View project details and contacts
City, State (County) Ashland, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing should consists of applying a thinned binder layer which will soak through the existing surface to improve the bond between layers which is starting to fail. Then additional layers of binder and fine rubber particles to be applied on the track surface. Next, the vendor will restripe the track.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents