Similar Projects
Green Lake Community Center and Swimming Pool
New Construction - 90,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Seattle, WA 98115

Redmond Senior & Community Center
New Construction
Design
$44,000,000 est. value
Redmond, WA 98052

Magnuson Park Community Center Improvements
New Construction, Renovation - 8,400 SF
Results
$2,650,000 est. value
Seattle, WA 98115

Family First Community Center Project
New Construction
Results
Renton, WA

Assisted-Living and Memory Care Facility
New Construction - 122,400 SF
Pending Verification
$25,000,000 est. value
Spokane, WA 99223

South Kitsap Community Center
New Construction - 14,000 SF
Design
$20,000,000 est. value
Port Orchard, WA

Federal Way Community Center Slide Replacement
New Construction
Post-Bid
Federal Way, WA 98003

Skagit County East Community Resource Center Modifications
Renovation
Results
$205,140 est. value
Concrete, WA 98237

New Food Services Central Warehouse
New Construction
Pending Verification
Othello, WA

Wenatchee Valley Ymca New Facility
New Construction, Infrastructure
Conception
$22,000,000 est. value
Wenatchee, WA 98801

Puyallup Recreation Center Building Envelope Improvements
Renovation
Results
$1,000,000 to $1,500,000 est. value
Puyallup, WA 98371

New Community Recreation Center
New Construction - 64,000 SF
Design
$31,600,000 est. value
Gig Harbor, WA 98335

Reported 03/03/2022 12:00 AM
Project Title

Tenino Quarry House Renovation

Physical Address View project details and contacts
City, State (County) Tenino, WA 98589   (Thurston County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves renovation of Tenino Quarry House. The elements of the project include the following: 1. Repair aging floor posts and support beams. 2. Replace windows. 3. Provide and install new ductless heat pump. 4. Upgrade electrical. 5. Paint inside and outside. 6. Remodel kitchen to include new appliances, countertop, grease trap and vent hood. 7. Update bathrooms and bring up to ADA standards. 8. Repair and replace exterior siding as required.

Details

Clubhouse/Social Club, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents