Similar Projects
Last Updated 05/20/2022 10:17 AM
Project Title

C.H. 31 87th Street at Woodward Avenue

Physical Address View project details and contacts
City, State (County) Bolingbrook, Woodridge, IL 60517 (DuPage, Will Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The planned work is primarily along the stretch of the Project Corridor along 87th Street from the intersection to approximately 0-17 miles east.  The improvements include the following: road widening, resurfacing, and light pole installation. The maximum depth of excavation is anticipated to be approximately 25 feet bgs. Intersection Widening, milling and resurfacing, new retaining wall, and the upgrade of existing traffic signals at the 87th Street at Woodward Avenue intersection in Woodridge, includes 115 unit tree removal; 3,270 cu yd earth excavation; 2,260 cu yd removal and disposal of unsuitable material; 1,931 cu yd trench backfill, 840 cu yd topsoil excavation and placement; 4,954 sq yd sodding salt tolerant; 5,014 ft perimeter erosion barrier; 50 inlet filters; 8,137 sq yd aggregate subgrade improvement 16"; 2,146 sq yd subbase granular material, type b 2"; 4,370 sq yd HMA base course; 2,264 lb bituminous materials (prime coat); 10,710 lb bituminous materials (tack coat); 17,900 ft longitudinal joint sealant; 3,570 ton HMA binder course; 2,780 ton polymerized HMA surface course; 5,265 sq yd protective coat; 18,145 sq ft PCC sidewalk; 5,795 ft combination curb and gutter removal; 14,933 sq ft sidewalk removal; 8,600 sq ft median removal; 120 sq yd class D patches; 3,820 sq ft segmental concrete block wall; 1,585 ft storm sewers class A; 965 ft storm sewer removal; 400 ft ductile iron water main; 10 ea catch basins; 6 ea manholes; 27 ea inlets; 6,227 ft combination concrete curb and gutter; 260 cu yd non-special waste disposal; 9,810 ft thermoplastic pavement marking line; 1,257 ft underground conduit, galvanized steel; 3 handholes; 10 ea relocate existing lighting unit; 13,159 ft electric cable in conduit, signal; 4 ea steel mast arm assembly and pole; 5 ea steel combination mast arm assembly and pole; 162 ft concrete foundation; 24 ea signal heads, led, 1-face; 1 ea temporary traffic signal installation; 16,788 ft remove electric cable from conduit; 2 ea remove existing traffic signal equipment; 7 ea remove existing handhole; 1 ea video detection system; 160 sq yd bike path removal; 28,100 sq yd HMA surface removal, variable depth; 1 ea full-actuated controller and cabinet; 330 recessed reflective pavement markers;

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents