Similar Projects
Last Updated | 08/11/2022 06:05 PM |
Project Title | Santiago Canyon College Barrier Removal Lot 2 & 7 Crosswalks |
Physical Address | View project details and contacts |
City, State (County) | Orange, CA 92869 (Orange County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Concrete, Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $279,500 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Engineer's estimate is between $320,000.00 - $360,000.00 Project no: 04-120877 Rancho Santiago Community College District (RSCCD) of Orange County, California, acting by and through its Board of Trustees (District), will, in accordance with Public Contract Code 22037 and 22036, receive, up to but not later than the below-stated date and time, sealed bids for an award of a Contract for Bid #1422 Barrier Removal Lots 2 and 7 Crosswalk Improvement Project at Santiago Canyon College. Contractors License Classification. Bidders must possess the following classification(s) of California Contractors License at the time that the Bid Proposal is submitted and at time the Contract for the Work is awarded: B - General Building. The Bid Proposal of a Bidder who does not possess a valid and in good standing Contractors License in the classification(s) set forth above will be rejected for non-responsiveness. Any Bidder not duly and properly licensed is subject to all penalties imposed by law. No payment shall be made for the Work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed for the Work. Contract Time: The Contract Time is 166 calendar days from date of Notice to Proceed to Final Completion. Failure to achieve the Contract Time will result in the assessment of Liquidated Damages as set forth in the Contract. Any late attendees will not be allowed to sign in. A Bid Proposal submitted by a Bidder whose representative(s) did not attend the entirety of the Mandatory Job Walk will be rejected by the District as being non-responsive. Visitor parking stalls may be utilized for the duration of the job walk, if available (Lot 6 at Santiago Canyon College). No day parking permit is required for the job walk. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. Labor & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two (2) each of Labor & Material Payment Bond and a Performance Bond issued by a California Admitted Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. Disabled Veteran Business Enterprises (DVBE) Participation Goal. Pursuant to Military & Veterans Code 999.2 and the Districts Board Policy, the District has established a Good Faith Participation Goal for DVBEs of Three Percent (3%) of the value of the Work. Pre-Bid Questions. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the District in writing by email to facilitiesbid@rsccd.edu (Pre-Bid Questions). Pre-Bid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. June 9, 2022 on the Districts Pre-Bid Clarification Form provided within. Bidders are solely responsible for submission of Pre-Bid Questions prior to such time/date; the District will not respond to Pre-Bid Questions submitted after such time/date. Responses to timely submitted Pre-Bid Questions will be in the form of Addenda posted on the Districts Purchasing Department webpage. Bidders are solely responsible for review of the Districts Purchasing Department webpage to obtain Addenda issued during the bidding process. No person is authorized to: (i) render an oral interpretation, correction or modification of any portion of the Contract Documents; or (ii) provide oral responses to Pre-Bid Questions. No Bidder may rely on any such oral interpretation, correction, modification or response. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |