Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

High School Additions and CTE Expansion GMP#2
Addition, Demolition, Renovation, Infrastructure
Bidding
$15,600,000 CJ est. value
Elgin, TX 78621

SH 304 - Widen Road - Add Shoulders
Infrastructure
Bidding
$2,941,990 CJ est. value
Rosanky, TX 78953

East Construction of Sitework, Fencing, Planting and Irrigation
Alteration
Post-Bid
Bastrop, TX

ADELTON - Section I, Phase I - Sitework / Planting / Irrigation
Infrastructure
Post-Bid
$270,000 CJ est. value
Bastrop, TX 78602

RFP D/B - Precinct 3 Road and Bridge Facility Construction Project
New Construction, Infrastructure - 400 SF
Results
$269,000 CJ est. value
Bastrop, TX 78602

Sections 6, 7 and Regional Detention Pond Improvements
Infrastructure
Results
Bastrop, TX

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Carr Lane Manufacturing Facility
New Construction, Infrastructure - 49,948 SF
Pending Verification
$4,400,000 CJ est. value
Elgin, TX 78621

Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

Construction of the Colony M.U.D. 1C, Section 8
Infrastructure
Post-Bid
$880,000 CJ est. value
Bastrop, TX 78602

2022 Street Improvements Project
Infrastructure
Results
$351,393 CJ est. value
Elgin, TX 78621

Last Updated 12/29/2022 10:04 AM
Project Title

Line 204 Studios-Stage A

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Single story high bay sound stage with support spaces. As of December 29, 2022, design is underway. A building permit application has not been filed with the City of Bastrop Building and Permitting. General contractor information has not been disclosed. A construction timeline has not been provided. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 22,740 SF.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents