Similar Projects
Last Updated | 12/28/2018 12:28 PM |
Project Title | Bruce Alley Improvements |
Physical Address | View project details and contacts |
City, State (County) | Waynesboro, VA (Waynesboro City County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Milling at Bruce Alley: Mill approximately 2,000 SF of existing asphalt Remove/dispose of all milling debris. Use caution around existing gas line ports and utility manholes and covers. Remove/store for re-installation any existing parking signs. 2. Fencing Installation: Install approximately 30 LF of fencing along alley border and at rear of 330 West Main Street building. Use the following type of fencing or approved equivalent: Stephens Pipe and Steel LLC, Ornamental Steel Fence System, SPS Centurion 2-rail Titan Style, 4-feet high 3. Landscaping Installation: Supply/install/warranty (1 year) twenty-five (25) Emerald Arborvitae Thuja occidentalis Smaragd shrubs along side and rear property lines and provide all labor, equipment, and materials to complete the installation. Shrubs should be approximately 5 feet in height at installation and spaced apart six feet on center. 4. Crosswalk and ADA Ramp: Install stenciled crosswalk at location for "fish-themed" crosswalk An installed example of the "fish-themed" design may be found nearby, at the intersection of Arch Avenue and West Main Street in downtown Waynesboro. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |