Project Title | Sabine-Neches Waterway Channel Improvement Project-Dredging |
Physical Address | View project details and contacts |
City, State (County) | TX 77642 (Orange County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction work. Hopper Dredging, Channel deepening of the existing channel from the Sabine Bank Channel to the Sabine Jetty Channel, extension of the existing channel 13 miles offshore, an option of existing channel deepening along the Sabine Pass Channel. The total dredging volume under Contract 2 is approximately 19,000,000 CY. The production rate for the base schedule is 40,000CY/day. The options production rate is also 40,000CY/day. Award of options will occur before completion of base schedule. Actual construction sequencing would be determined by the dredging contractor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |