Similar Projects
Hickerson Hall and Neff Hall Roof Replacements
Alteration
Bidding
New Haven, CT 06515

Maloney Roof Repairs
Alteration
Bidding
Waterbury, CT 06706

Roofing Envelope Services
Post-Bid

Harry M. Bailey Middle School Partial Roof Replacement
Post-Bid
West Haven, CT 06516

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

New Roof or Limited Roof Repair for the North Branford Police Department
Results
North Branford, CT 06472

West Haven Public Works Garage Roof Replacement
Post-Bid
West Haven, CT 06516

Western Hills Golf Course Roof Repair Project
Results
Waterbury, CT 06708

Roofing MACC
Post-Bid

Project Management Services for Bailey Middle School Roof Replacement
Results
West Haven, CT 06516

Roofing Repair and Maintenance
Post-Bid

Roof Repairs Tuttle Elementary School
Results
Less than $11,988 est. value
East Haven, CT 06512

Ferrara Elementary Portable Classroom Roof Replacement
Post-Bid
East Haven, CT 06513

Single Roof Go-Over at 55 John Street
Results
Wallingford, CT

Meetinghouse Roof Replacement
Infrastructure
Post-Bid
New Haven, CT 06511

Last Updated 01/07/2022 01:05 PM
Project Title

Fannie Beach Center Roof Project

Physical Address View project details and contacts
City, State (County) Milford, CT 06460   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install roof materials, insulation, flashings, and miscellaneous materials on the following designated roof areas: 1. Tear off designated roofing, insulation, flashings, perimeter metal, and obsolete equipment and properly dispose. 2. Bring to the attention of the building owner of all questionable substrate conditions and repair or replace decking as designated by building owner’s representative at a cost in addition to the contracted amount based upon line item quoting on Bid Form. 3. Install insulation, as specified. 4. Install tapered edge and saddles as required to keep water from standing at raised perimeter, upslope from curbs, and between drains and/or scuppers. 5. Install lead drain sumps as specified. 6. Install 60 mil EPDM sheet as specified. 7. Install flashings as specified. 8. Install gutters and downspouts as specified. 9. Install new coping, drip edge, gravel stop, reglet, counter flashing, lead stack flashings, and other metal components as specified. 10. Provide manufacturer’s warranty as specified.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents