Similar Projects
Sherrills Ford Road 1.0 MG Storage Tank
Infrastructure
Conception
$3,000,000 est. value
Sherrills Ford, NC 28673

111 Main Apartment Building
New Construction, Infrastructure - 5,000 SF
Design
$41,000,000 CJ est. value
Hickory, NC 28658

111 Main Apartment Building
New Construction, Infrastructure - 5,000 SF
Design
$41,000,000 CJ est. value
Hickory, NC 28658

East 5th Street Public Works Facility Stormwater Pipe Replacement
Infrastructure
Bidding
$220,000 CJ est. value
Newton, NC 28658

East 5th Street Public Works Facility Stormwater Pipe Replacement
Infrastructure
Bidding
$220,000 CJ est. value
Newton, NC 28658

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Statewide Intelligent Transportation System
Infrastructure
Post-Bid

Roadway Improvements - Phase 2
Infrastructure
Results
$545,000 est. value
Claremont, NC

Pavement Resurfacing for 2021-2022
Infrastructure
Results
Hickory, NC

Maiden Elementary School for Catawba County Schools
Demolition, New Construction, Infrastructure - 95,007 SF
Construction
$29,000,000 CJ est. value
Maiden, NC 28650

Maiden Elementary School for Catawba County Schools
Demolition, New Construction, Infrastructure - 95,007 SF
Construction
$29,000,000 CJ est. value
Maiden, NC 28650

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

Additions and Renovations at Newton Conover High School
Addition, Renovation, Infrastructure
Pending Verification
$20,800,000 CJ est. value
Newton, NC 28658

15th Street Creek Embankment Repair
Infrastructure
Bidding
$400,000 CJ est. value
Newton, NC 28658

Punch Loop Road Relocation
Infrastructure
Post-Bid
$2,000,000 est. value
Conover, NC 28613

Last Updated 11/29/2022 10:34 PM
Project Title

Road Improvement Project

Physical Address View project details and contacts
City, State (County) Newton, NC 28658   (Catawba County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $69,489 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Catawba County (hereinafter "County") is requesting bids from qualified Contractor(s) to provide repairs and alternations to the roads located within the Norman Plantation Subdivision in Catawba County. Norman Plantation Subdivision is located off Greenwood Road in the Southwest part of Catawba County near the Terrell Community. It consists of 14 residential lots and has two streets. Live Oaks Avenue is the main access road and Hearthstone Court is a short street cul-de-sac off of Live Oaks Avenue. The residents of Norman Plantation have petitioned Catawba County to finance repairs and alterations to the Roads in the subdivision to bring them up to North Carolina Department of Transportation (NCDOT) standards with the goal that the roads will be accepted by NCDOT into the Secondary Road Maintenance Program. The Norman Plantation Subdivision was platted in 1999 and the roads were constructed around that time. Currently, the roads are in good condition with no potholes and minimal cracking of the road surface. In September of 2010, the NCDOT inspected the subdivision roads and provided a list of issues that needed to be corrected. Since 2010 a few other issues have developed that need to be addressed before the roads would be accepted into NCDOT's maintenance program. Submit Written Questions September 1, 2022 at 5:00 PM Provide Responses to Questions September 5, 2022 at 5:00 PM Written questions shall be emailed to tinawright@catawbacountync.gov by the date and time specified above. Contractor should enter "IFB #: 304-23-1001 - Questions" as the subject for the email. PAYMENT BOND: The Contractor is required to submit a Payment Bond in the amount of 100% of the Contract Sum, conditioned upon the prompt payment for all labor or materials for which Contractor or a subcontractor is liable. The Contractor is required to submit a Performance Bond in the amount of 100% of the Contract Sum, conditioned upon the faithful performance of this Agreement in accordance with the Plans, Specifications and conditions of the Bid and Contract Documents. Catawba County reserves the right to reject any and all Bid responses and to waive informalities as may be permitted by law.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents