Similar Projects
Gateway Bridge Bid Package #4
New Construction
Post-Bid
Tulsa, OK 74127

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Myriad Gardens Crystal Bridge Renovation
Renovation
Results
OK 73102

Stricklin Bridge
New Construction
Results
Muskogee, OK

BNSF OKC River Connection
New Construction, Alteration
Post-Bid
Oklahoma City, OK

New Pedestrian Bridge & Water Line Relocation NW Expressway and W Wilshire Blvd
Infrastructure
Results
$3,851,000 est. value
Oklahoma City, OK 73195

Pedestrian Bridge Ray Trent Park
New Construction, Infrastructure
Post-Bid
$200,000 est. value
Del City, OK 73115

Pre-Engineered Aluminum Box Culvert Bridge Structure with Headwalls and Wingwalls Structure
New Construction, Infrastructure
Results
Broken Arrow, OK 74011

Materials Bridge 93A
Infrastructure
Post-Bid
Newkirk, OK

Bridge and Approaches
New Construction, Infrastructure
Results
OK

Build a Low Water Bridge on Cummings Avenue
New Construction, Infrastructure
Post-Bid
$273,000 est. value
Pocola, OK 74902

Bridge Repair
New Construction, Infrastructure
Results
OK

Ray Trent Park Pedestrian Bridge
New Construction, Infrastructure
Post-Bid
$200,000 est. value
Del City, OK 73115

Bridge And Approaches
New Construction, Infrastructure
Results
OK

Bridge And Approaches
New Construction, Infrastructure
Results
OK

Last Updated 12/19/2022 03:05 AM
Project Title

Bridge and Approaches - SH 19

Physical Address View project details and contacts
City, State (County) Blair, OK 73526   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2025
Bids Due View project details and contacts
Estimated Value $11,756,126 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-19: at the N. Fork of the Red River Located at the Jackson/kiowa County Line. As of December 19, 2022, the project is in Design status. Anticipated letting month/year is May, 2024. Length : 0.390 Mi. OKDOT - Bridge and Approaches - SH 19 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents