Similar Projects
Stairway Rubber Tread Replacement
Bidding
Dearborn, MI

Replacement of Tile Floors at Canfield Community Center
Bidding
Dearborn Heights, MI 48127

Carpet Installation
Post-Bid
Detroit, MI

Carpet Replacement at Cass/Shared Time Bid
Post-Bid
Livonia, MI

Marble Floor Restoration - Court
Results
Less than $46,440 est. value
Dearborn, MI

Carpet Replacement - Disc Banquet Room
Results
Less than $15,263 est. value
Dearborn, MI 48126

Cesar Chavez Academy - RFP: Retiling of Bathrooms
Renovation
Bidding
Detroit, MI 48209

Romulus Schools - Floor Replacement
Post-Bid
Romulus, MI 48174

Rubber Flooring Install at the Disc - Lobby
Results
Dearborn, MI

Applebaum Pharmacy Flooring Upgrades
Post-Bid
Detroit, MI

Lap Pool Tile Baseboard and Windowsill Replacement
Results
Livonia, MI 48154

Fire Station Training Center Floors Polishing
Post-Bid
Dearborn, MI

Carpet for Kirksey Recreation Center Gymnastic Room
Results
Livonia, MI 48154

DRCFA TCF Center Phase IV Project Tile Materials Only
Post-Bid
Detroit, MI 48226

Taylor Recreation Center Equipment Replacement
Results
Taylor, MI 48180

Reported 12/18/2019 12:00 AM
Project Title

Churchill Educational Center Gymnasium Flooring Replacement

Physical Address View project details and contacts
City, State (County) Detroit, MI   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of the existing bleachers. Remove existing flooring, base and mastic – grind smooth and patch divots. Remove all existing standards complete in the floor and patch holes. Prep floor per the manufacturer’s recommendations – provide Ardex or similar. Install Taraflex Sport M Plus product per the manufacturer’s specifications. Game lines shall match existing. Add game lines for volleyball. Owner to determine final line colors. Contractor to provide a shop drawing for owner’s review. Baseline area and keys shall be blue 6430 Blue. Main court shall be Light Cherry. Add logo in center of gym – 6’ diameter custom artwork supplied by ROS – 3 colors.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents