Similar Projects
Piney Creek Lift Station Upgrades
Renovation
Bidding
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

Whitewater Lift Station Rehabilitation Project
Renovation
Bidding
CO

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Lift Station Valve Assembly Construction
Results
Less than $122,000 est. value
Falcon, CO

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

CMAR Non-Potable Irrigation Pump Stations
New Construction
Bidding
Greeley, CO 80631

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

Tuscany Tract O Irrigation Pump Skid
Results
Evans, CO

Quail Dunes Golf Course Pump Station Replacement
New Construction, Infrastructure
Bidding
Fort Morgan, CO

Non-Potable Irrigation Pump Stations for Water and Sewer Department
New Construction
Post-Bid
Greeley, CO 80631

Eccv Office Expansion
Renovation
Results
Less than $2,000,000 est. value
Aurora, CO 80016

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

Last Updated 02/08/2022 09:34 AM
Project Title

Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Crested Butte, CO   (Gunnison County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include the following: The Work will include all necessary labor, supervision, equipment, tools, and materials to install two new submersible centrifugal lead/lag pumps within an existing concrete wet well, a bypass drain system, and level sensors in the wet well. Work includes, but is not limited to, associated process piping and valves, tie-in to existing piping, a new odor control unit and appurtenances, new coarse screen brushes, and all associated electrical conduit, wiring and controls. Sanitary sewer bypass pumping is required during work.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents