Similar Projects
NERAC20 Generator and Portable Message Boards
Infrastructure, Alteration
Bidding
Boston, MA

10Kva Liebert UPS
Alteration
Bidding
Boston, MA

Metro Region - Maintenance and Repair of DCR Pools Systems and Equipment - Sub-Bids
Alteration
Sub-Bidding
$1,800,000 est. value
Boston, MA

Central and Western Pool Mechanical Services - Sub-Bids
Alteration
Sub-Bidding
$1,500,000 est. value
Boston, MA

Library Atrium HVAC Renovation and Associated Work
Post-Bid
Wellesley, MA

RTU Replacement
Post-Bid
Wellesley, MA

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

Needham High School Automatic Transfer Switch Replacement
Results
Less than $35,000 est. value
Needham, MA 02492

On-Call Plumbing Services
Alteration
Bidding
$100,000 est. value
Quincy, MA

Interior and Exterior Lighting Upgrades of 833 Interior and 50 Exterior Fixtures at the Bellingham High School
Post-Bid
Less than $150,000 est. value
Bellingham, MA 02019

Renovation and Expansion of Existing Locker Rooms at Ulin Rink - Sub-Bids
Results
Less than $475,000 est. value
Milton, MA

HVAC Preventative Maintenance
Alteration
Bidding
Wellesley Hills, MA

200-1 Barton Road Family Development - Filed Sub-Bids
Post-Bid
Wellesley, MA

Upgrade to Norwood Civic Center Elevator - Filed Sub-Bids
Results
Less than $400,000 est. value
Norwood, MA

Removal and Replacement of Wood Clapboard Siding - Sub-Bids
Post-Bid
Less than $281,996 est. value
Wellesley, MA

Last Updated 10/07/2021 09:38 AM
Project Title

Magazine Beach Pool Bathhouse Renovation - Sub-Bids

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Masonry, Painting, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Magazine Beach Pool Bathhouse Renovation: including interior work to create relocated ADA compliant men's and women's rooms, upgraded building systems, first aid room, staff locker room, family changing rooms, new finishes, and increased storage space. Physical work will be done during the facility fall/winter/spring off-season and be completed for use in summer 2022.

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents