Similar Projects
Madison Food Park Cheese Processing Facility
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Great Falls, MT 59401

Valeria Way, Phase 2 - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

D/ B - Emergency Relief (ER) - Red Lodge Area Flood Repairs
Infrastructure
Design
$300,000 est. value
Red Lodge, MT 59068

Richey Shop Building
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Richey, MT 59259

Love's Travel Stop # 679 - RV Park / Hardin
New Construction, Infrastructure - 658 SF
Bidding
$200,000 CJ est. value
Hardin, MT 59034

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Chip Seal Windham South Lewistown Area
Infrastructure
Post-Bid
Lewistown, MT

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Filter Main Replacement Phase 2 - City of Great Falls
Infrastructure
Conception
$4,500,000 CJ est. value
Great Falls, MT 59401

Forest Park Transmission Mains
Infrastructure
Bidding
$2,000,000 CJ est. value
Glendive, MT 59330

Last Updated 04/17/2023 10:33 AM
Project Title

Smelter City Recreation Complex

Physical Address View project details and contacts
City, State (County) Anaconda, MT 59711   (Deer Lodge County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $23,770,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to construct a new recreation complex. A detailed scope has not been identified. As of April 17, 2023, this project is in planning phase. Funding has not been allocated. The design firm has been selected; however, detailed information regarding design firm has not been disclosed. Further details regarding design completion and firm construction timelines have not been identified. *The contact(s) will not accept phone call inquiries at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents