Similar Projects
Oak Bridge Financial / Two Eldridge
Renovation - 1,726 SF
Design
$115,000 est. value
Houston, TX 77079

Gallagher / 5810 Wilson Road
Renovation
Design
$150,000 est. value
Humble, TX 77396

Chase Copperfield West Relocation / Houston
Renovation - 5,318 SF
Post-Bid
$1,500,000 CJ est. value
Houston, TX 77084

Bank of America
Renovation - 2,187 SF
Construction
$500,000 est. value
Houston, TX 77011

Shell Federal Credit Union
Renovation, Addition
Construction
$850,000 est. value
Deer Park, TX 77536

Chase Bank - Alief / Houston
Renovation - 3,744 SF
Pending Verification
$740,000 CJ est. value
Houston, TX 77072

PNC - FM 1960 / Houston
Renovation - 6,286 SF
Pending Verification
$500,000 CJ est. value
Houston, TX 77065

Frost Bank - Avalon
Renovation - 3,909 SF
Design
$2,500,000 CJ est. value
Houston, TX 77098

Chase Bank
Renovation - 4,373 SF
Construction
Houston, TX 77063

PNC Bank Houston Heights / Houston
Renovation - 3,016 SF
Pending Verification
$500,000 CJ est. value
Houston, TX 77008

City National Bank / 1800 W. Loop
Demolition, Renovation - 3,251 SF
Design
$410,000 CJ est. value
Houston, TX 77027

Texas Gulf Bank - River Oaks
Build-out - 1,878 SF
Construction
$350,000 CJ est. value
Houston, TX 77019

PNC - Fry Road / Katy
Renovation - 2,713 SF
Pending Verification
$500,000 CJ est. value
Katy, TX 77450

Mosaic Advisors Expansion / Regions Bank
Addition, Demolition, Renovation, Infrastructure - 1,139 SF
Design
$80,000 CJ est. value
Houston, TX 77046

PNC Post Oak Renovations / 2200 Post Oak
Demolition, Renovation - 22,000 SF
Construction
$2,230,000 CJ est. value
Houston, TX 77056

Last Updated 01/31/2023 10:14 AM
Project Title

West Texas National Bank Suite Relocation / 609 Main

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Commercial
Sub-Category(s) Bank
Contracting Method Bids by Invitation
Project Status Occupancy, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction is complete.

Details

953 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents