Similar Projects
Industrial/Commercial Type Washer and Dryer
Design
Fort Bragg, NC

San-Lee Park Bird Enclosure
Post-Bid
Sanford, NC

Audio Visual (Av) System Design Build
Post-Bid
NC

Upgrade of Cold Spray System
Results
Cherry Point, NC 28533

Spectra Precision Focus 35 Robotic Total Station
Results
Salem, NC

Leaf Machine
Post-Bid
Oxford, NC

AV/VTC Services Camp Lejeune, NC
Results
Camp Lejeune, NC

Pass-Thru Hot Food Holding Cabinet at North Belmont Elementary
Post-Bid
Belmont, NC 28012

Automated Fuel System Installation (AFSI)
Results
Cherry Point, NC

Filter Air Wash Equipment
Post-Bid
Charlotte, NC

Audio Visual System (Including Install)
Results
Fort Bragg, NC 28403

Gas and Electric Combi Ovens
Post-Bid
High Point, NC

East College Park Mail Kiosk
Results
Raleigh, NC

Filter Underdrains and Media
Post-Bid
Charlotte, NC

19-6-SW Tracked Conveyor
Results
Fayetteville, NC

Reported 01/02/2019 03:03 PM
Project Title

Cameron Cogeneration Facility-Dry Sorbent Injection System

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC   (Orange County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description Install a dry sorbent injection system to control HCl gas in the boiler exhaust.
Details
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Buildings.
Division 11 - Equipment.
Division 31 - Earthwork, Driven Piles, Composite Piles.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents