Similar Projects
Last Updated | 05/04/2023 04:34 PM |
Project Title | DCR - Pocahontas State Park - Pool Pump Replacement - Nonprofessional Services Minor Maintenance and Repair |
Physical Address | View project details and contacts |
City, State (County) | Chesterfield, VA 23832 (Chesterfield County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $29,965 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish all labor, materials , tools, equipment, insurance and supervision to conduct repairs on the Pocahontas State Park Pool Pump System located at Pocahontas State Park. Micro Business Set-Aside for Award Priority he purpose and intent of this Quick Quote is to obtain a fixed price bid to furnish all labor, materials, tools, equipment, insurance, and supervision to conduct repairs on the Pocahontas State Park Pool Pump System located at Pocahontas State Park, 10301 State Park Road, Chesterfield, Virginia 23832 A. SCOPE OF WORK Lot 1: Replace Main Pool pump, Model ITT Marlow Pump model number 6E4P, or Agency Approved Equivalent meeting the minimum specifications and capabilities below: 1. The Contractor shall provide and install a pool pump to tie into existing plumbing and electrical with minimal plumbing and electrical modifications. 2. The Pump shall be able to maintain the 8-hour turnover rate minimum set by VDH standards and achieve the required turnover rate for each pool. 3. The Pump shall have a Minimum 5-year transferrable warranty the contractor agrees to provide at the time of invoicing. 4. The Pump shall be able to support the following minimal activity: a. Activity Pool (48,000 gallons): 1.2-hour turnover rate and flow rate of 670 GPM. b. 3 Foot Pool (128,600 gallons): 5-hour turnover rate and flow rate of 430 GPM. c. 5 Foot Pool (88,000 gallons): 4.9 hours and flow rate of 300 GPM. 5. Contractor shall provide a list of identified additional parts upon inspection at time of site visit to park representative and noted individually by attachment at time of bid. B. SCOPE OF WORK Lot 2: Replace (4) Four Valves for backwashing, 1. Contractor shall provide and install (4) four each valve (s) with replacement noncorrosive high-quality valves. Valves should be incorporated into the existing system in the same manner as original valves. a) (4) four each (6") Six Inch valves 2. Contractor shall provide a list of identified additional parts upon inspection at time of site visit and noted individually by attachment at time of bid. C. SCOPE OF WORK Lot 3: Install a flow rate meter that compliments and works with the pump being bid. 1. Contractor shall provide and install (1) one flow meter in the line after the filters and before the lines to the individual pools. 2. Contractor shall provide to park representative any additional parts upon inspection (site visit) included in quote and noted individually at time of bid. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |