Similar Projects
Building 200 Wing B2 Renovate VAV Controls
Term Contract
Design
$250,000 to $500,000 est. value
Johnson City, TN 37604

TCAT HVAC, Plumbing and Lighting Upgrades
Alteration
Bidding
Paris, TN 38242

WMS/CMS Gymnasium HVAC Installation
Alteration
Bidding
Collinwood, Waynesboro, TN 38485

HVAC Replacement, Lighting, and Associated Renovations
Post-Bid
Chattanooga, TN 37406

HVAC Installation
Post-Bid
Millington, TN 38053

HVAC Replacement for Dogwood Manor
Results
Chattanooga, TN 37402

HVAC Replacement at Center for Creative Arts - Phase 2
Results
Chattanooga, TN 37405

38 HVAC Rooftop Units
Term Contract
Bidding
Dyersburg, TN

Heating and Cooling System
Post-Bid
Medon, TN 38356

Fogelman Executive Building Upgrades HVAC Controls
Results
Memphis, TN 38152

Paulette Elementary HVAC Rooftop Units
Alteration
Bidding
Maynardville, TN 37807

Town Hall HVAC Maintenence
Term Contract
Post-Bid
Atoka, TN

HVAC Replacements Water Sewer Building
Results
Lebanon, TN 37087

Remove and Replace the HVAC System at the Mountain Arts Community Center Cafeteria
Alteration
Bidding
Signal Mountain, TN 37377

2021 Indoor Air Quality Improvements - Furnishing of Air Purification Equipment
Post-Bid
Greeneville, TN

Reported 02/25/2022 12:00 AM
Project Title

HVAC Filter Services

Physical Address View project details and contacts
City, State (County) TN   (Robertson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish and change all HVAC filter materials in twenty-four (24) building sites in the Robertson County School System. The bid must include the complete cost of changing all filters, cleaning/replacing washable filters, cleaning the immediate area around the return grill and filter area satisfactory to the County during the contract period. Cleaning in the filter area includes, but is not limited to, removing dust and foreign material collected in that area during normal operation of the unit, foreign material between the filter and the unit, removing dirt, dust and debris from the return grills and surrounding areas, and the proper disposal of dirt, foreign materials and used filter materials. Every new filter or washed filter must be marked with bold ink, or tagged, indicating the date of service and initialed by the serviceman. Contractor will verify all filter door screws and fasteners are installed properly with current hardware. Contract will verify filter sizes per manufacturers recommendations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents