Reported 06/15/2019 12:00 AM
Project Title

Abatement, Demolition and Restoration Services

Physical Address View project details and contacts
City, State (County) NC   (Robeson County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Demolition, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description All project sites are located within incorporated or unincorporated Robeson County. Existing buildings that are part of an open space acquisition and demolition project must be removed and disposed of in accordance with applicable laws within 90 days of closing and settlement of the property acquisition transaction. Phase 1 - Asbestos and Hazardous Material Abatement, Removal and Disposal Each project site will have been tested for asbestos, lead, with other hazardous materials inventoried and quantified by a third party prior to commencement of work under this procurement. Contractor will be responsible for coordinating with the County-hired third party hazardous materials testing consultant to successfully conduct abatement, removal and disposal activities. Work under this phase will be dependent upon testing and inventory results, and may not be required at all project sites. Phase 2 - Demolition of Structures and Debris Removal Each Project site will require demolition of site improvements and debris removal according to site conditions. Demolition work required under this phase may include, but is not limited to: houses, detached accessory structures, foundations/slabs only, basements, septic tanks, onsite wastewater treatment systems, water wells, propane tanks, cisterns paved and gravel driveways, retaining walls, fences and other improvements that may be found on the property. This phase may also include the removal of flood deposited sediment, vegetative debris, trees, abandoned vehicles, etc. Phase 3 - Site Grading and Restoration Contractor will be required to re-grade the site upon successful completion of demolition activities, which may include filling and/or grading erosion caused by flood waters to blend in with the contours of surrounding areas, filling holes left by basements with acceptable fill material, grading the site to a level grade matching adjacent contours, and removing site access points, etc. Other site restoration, seeding, weed-free straw mulch application, erosion matting or other control measures may also be required, and will be identified on a per-site basis.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Demolition, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents