Similar Projects
Last Updated | 08/04/2022 01:34 PM |
Project Title | Replace Parking Lots and Roadways Triton College |
Physical Address | View project details and contacts |
City, State (County) | River Grove, IL 60171 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Obtained from a credible source, Awaiting verification, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,050,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 4, 2022, an engineer has been selected and stage of design has not been determined. construction is not expected to start prior to August 2023. *The closed solicitation has been included below for reference: The Triton College - River Grove, is a 23-building facility established in 1964. INTERVIEW LEVEL The scope of work provides for replacement of approximately 400,000 square feet of asphalt parking lots and roadways and associated curb, gutter, sidewalk, landscape, drainage, and sewer replacement. A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 3 percent is applicable to the A/E team. The Illinois Works Jobs Program Act Apprenticeship Initiative will apply to all prevailing wage eligible work performed on this project. The interviews for this project are tentatively scheduled for September 30, 2021. Selections from this project will be presented at the November 9, 2021, Board Meeting. PROFESSIONAL LIABILITY INSURANCE REQUIRED: $1,750,000 APPROPRIATED AMOUNT: $6,037,500 The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||
Details | 400,000 SF.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |