Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Sidewalk, Curb
Results
Hanover Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

2021 Crack Routing and Sealing
Results
Hanover Park, IL

HMA Resurfurfacing
Post-Bid
IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Northwest Parking Lot Improvements
Post-Bid
IL

Crack Filling/Seal Coating/Striping at Triphahn Center Parking
Results
Hoffman Estates, IL 60169

Last Updated 08/04/2022 01:34 PM
Project Title

Replace Parking Lots and Roadways Triton College

Physical Address View project details and contacts
City, State (County) River Grove, IL 60171   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $8,050,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 4, 2022, an engineer has been selected and stage of design has not been determined. construction is not expected to start prior to August 2023. *The closed solicitation has been included below for reference: The Triton College - River Grove, is a 23-building facility established in 1964. INTERVIEW LEVEL The scope of work provides for replacement of approximately 400,000 square feet of asphalt parking lots and roadways and associated curb, gutter, sidewalk, landscape, drainage, and sewer replacement. A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 3 percent is applicable to the A/E team. The Illinois Works Jobs Program Act Apprenticeship Initiative will apply to all prevailing wage eligible work performed on this project. The interviews for this project are tentatively scheduled for September 30, 2021. Selections from this project will be presented at the November 9, 2021, Board Meeting. PROFESSIONAL LIABILITY INSURANCE REQUIRED: $1,750,000 APPROPRIATED AMOUNT: $6,037,500 The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

400,000 SF.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents