Similar Projects
I-95 SB over Bagshaw Swamp
New Construction
Conception
$4,309,000 est. value
Ridgeland, SC 29912

US 76 over US 601
New Construction, Renovation, Infrastructure
Conception
Less than $9,648,000 est. value
Columbia, SC 29205

Bridgeway Station Master Development
New Construction - 378,000 SF
Design
$150,000,000 est. value
Mauldin, SC

US 301 Over North Edisto River and Swamp
New Construction, Infrastructure
Design
$27,691,000 est. value
Orangeburg, SC 29118

Bridge Maintenance - US 1 / SC 9
Infrastructure
Bidding
Bennettsville, SC 29512

Bridge Replacement - SC 85 (Southern R.R). and S-995
New Construction
Post-Bid
SC

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge Maintenance - I-526 (Wando River)
Results
SC

Melvin Hill Road Bridge
Results
Campobello, SC 29322

I-95 NB over Bahama Swamp and Bagshaw Swamp - Bridge Preservation (Jasper County)
Infrastructure
Design
$4,309,000 est. value
Ridgeland, SC 29912

Saluda Shoals Front Bridge and Over Look Repair
Post-Bid
$22,000 est. value
Columbia, SC 29212

Bridge - Union County
Term Contract
Results
SC 29379

Bridge D5 Dillon County
New Construction, Term Contract
Post-Bid
SC

On-Call Bridge Repair Clarendon
Term Contract
Results
SC

Bridge Replacement - US 1 (SCL RR)
New Construction, Infrastructure
Post-Bid
$13,320,000 est. value
SC

Last Updated 06/29/2022 11:27 AM
Project Title

Harts Bluff Road (S- 68) Bridge Replacement over Tidal Stream in Charleston County

Physical Address View project details and contacts
City, State (County) Wadmalaw Island, SC 29487   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected November 2023
Bids Due View project details and contacts
Estimated Value $3,480,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bridge Replacement As of June 28, 2022, the project is in Conceptual status. Anticipated letting month/year is March, 2023. SCDOT - Harts Bluff Road (S- 68) Bridge Replacement over Tidal Stream in Charleston County *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents