Similar Projects
Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Cnw Rr Bridge
Renovation
Design
$15,000,000 CJ est. value
Plymouth, WI 53073

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

Road and Parking Lot Improvements - Kohler Andrae State Park
Infrastructure
Bidding
$500,000 CJ est. value
Sheboygan, WI 53081

Calumet Drive Pavement Repair (Saemann Avenue to Main Avenue)
Infrastructure
Bidding
$900,000 CJ est. value
Sheboygan, WI 53083

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Road Projects
Infrastructure
Post-Bid
$123,000 est. value
Kiel, WI 53042

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C. Sheboygan, Indiana Avenue, Esslingen Park to South 24th Street
Infrastructure
Results
$75,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Indiana Avenue - Streetscape Improvements - Phase Two of Two
Infrastructure
Conception
$750,000 CJ est. value
Sheboygan, WI 53081

Last Updated 02/20/2023 10:14 AM
Project Title

Pedestrian Bridge Replacement Wade House

Physical Address View project details and contacts
City, State (County) Greenbush, WI 53023   (Sheboygan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $74,985 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents