Similar Projects
2021 Resurfacing Project
Post-Bid
Bay Minette, Daphne, Robertsdale, Spanish Fort, AL 36527

2021 Resurfacing Project Group B
Post-Bid
Elberta, Loxley, Robertsdale, AL 36551

Farmer`s Market Roadway Paving Project
Results
$50,000 to $75,000 est. value
Foley, AL

Mickey Miller Blackwell Stadium Track Runway Resurfacing
Results
Gulf Shores, AL

Asphalt Repair Eastbay Apartments
Infrastructure
Post-Bid
Daphne, AL

Addition of Paved Shoulders on CR-99 from Carrier Drive to Spanish Cove Drive South
Results
Lillian, AL 36549

Asphalt Resurfacing Project 2021
Infrastructure
Post-Bid
Loxley, AL

Resurfacing Projects 2021 Group 3
Results
AL

Provision of Labor and Equipment for Asphalt Placement
Infrastructure
Post-Bid
AL

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-3 (US-31) from the junction of Church Street
Results
$3,015,579 to $3,685,708 est. value
Bay Minette, AL 36578

Orange Beach Elementary School Resurfacing Project
Infrastructure
Post-Bid
Orange Beach, AL 36561

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe on SR-16 (US-90)
Results
$2,763,523 to $3,377,639 est. value
Spanish Fort, AL

Streets and Drainage 2021
Infrastructure
Post-Bid
Foley, AL 36536

Medical Village Access Improvements Phase 1B
Results
$1,400,000 to $2,100,000 est. value
Gulf Shores, AL

Resurfacing Projects 2022 Group 2 and 2RA
Infrastructure
Post-Bid
AL

Last Updated 05/25/2022 12:44 AM
Project Title

CID Highway 181 Eastern Shore Center Roadway Improvements

Physical Address View project details and contacts
City, State (County) Spanish Fort, AL 36527   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of rehabilitation of roadway of approximately 1.4 miles of roadway; work includes approximately 19,000 CY of Unclassified Excavation, 44,000 SY Aggregate Base Course and 8,000 TONS of Bituminous Concrete Pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents