Similar Projects
Mid America Commerce Center
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Belleville, IL 62269

Mid America Commerce Center
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Belleville, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Parking Lot Resealing Road Repair
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Scott Air Force Base, IL 62225

North Jefferson Street (Il 4) Shared Use Path
Infrastructure
Post-Bid
$324,013 est. value
Mascoutah, IL 62258

2021/2022 MFT General Maintenance Program - Sidewalk Replacement
Infrastructure
Results
$75,000 to $90,000 est. value
Mascoutah, IL

Class B Patch
Infrastructure
Results
$140,342 est. value
Belleville, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

Hampton Manor of St. Clair County
New Construction, Infrastructure - 66,481 SF
Design
$18,000,000 CJ est. value
O Fallon, IL 62269

L and N Railway Trail and Trailhead
Infrastructure
Post-Bid
$981,000 est. value
Mascoutah, IL

Last Updated 03/13/2023 09:13 AM
Project Title

Pavement Patching on IL 157

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62203   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $592,843 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement patching on IL 157 at Lake Drive / Foley Drive. Region 5 District 8 Federal Project #N/A County(s)St. Clair Key Route(s) FAP 592 Marked Route(s) IL 157 Section(s) (32-1)PP-1 State Job #(s) C-98-141-22 PPS #(s) 0-02177-8009 Completion Date: 20 Working Days Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 031 - Pavement Patching on IL 157

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents