Similar Projects
RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

RFP Design - Construction of 3 Bridge Structures - 66th Street South East Railroad Overpass Project
Infrastructure
Conception
$700,000 CJ est. value
Bismarck, ND 58504

Cottonwood Parkview Addition
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bismarck, ND 58501

Cottonwood Parkview Addition
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Bismarck, ND 58501

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course
Infrastructure
Bidding
$5,500,000 CJ est. value
Baldwin, ND 58521

ADA Curb Ramps, Median Islands, Signal Improvements, Rrfb, Milling, Hot Mix Asphalt, Concrete Pavement, Sidewalks, Curb and Gutter, Aggregate Base Course
Infrastructure
Bidding
$5,500,000 CJ est. value
Baldwin, ND 58521

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pipeline Inspection Crawler
Infrastructure
Post-Bid
Bismarck, ND 58504

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Maintenance At Bismarck, Jamestown, Fargo Subtaions
Results
Bismarck, West Fargo, ND 58501

Bismarck State College Polytechnic Building - BP #1
New Construction, Renovation, Infrastructure - 89,700 SF
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Bismarck State College Polytechnic Building - BP #1 (Partial Re-bid)
Demolition, New Construction, Infrastructure
Construction
$38,000,000 CJ est. value
Bismarck, ND 58506

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

Marquis Subdivision Self Storage
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Bismarck, ND 58504

RFP Engineering - Burnt Creek River Crossing Within 28th Street NW Project
Infrastructure
Conception
$200,000 CJ est. value
Hay Creek, ND 58503

Last Updated 03/30/2023 09:25 AM
Project Title

Bismarck Airport - Construct General Aviation Apron Expansion Phase 4

Physical Address View project details and contacts
City, State (County) Bismarck, ND 58504   (Burleigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,400,239 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 28, 2023, this project has not yet been awarded. The project is expected to be awarded tonight.** Project Category Code: Airport: Runways, Taxiways, Access Roads, Aprons, Paving - Concrete, Water Utilities, Electrical and Controls, Pavement - Marking, Roadway Lighting, Aggregate, Concrete Pavement, Electrical Installation/Construction, Erosion Control/Slope, Bank Stabilization, Traffic Control, Fire Hydrant, Pavement Removal, Erosion Control - Temporary, Paving (Asphalt or Concrete), Security/Monitoring Systems, Sitework/Excavating and Grading, Curbs, Signage Description: Construct General Aviation Apron Expansion Phase 4, including traffic control, pavement removal, earthwork, aggregate base course, drain tile, asphalt paving, concrete paving, geogrid, geotextile fabric, chain-link fence, electrical, and miscellaneous items. Each bid shall be accompanied by a separate envelope containing a Bid Bond in a sum equal to five percent (5%) of the maximum bid price, executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to the City of Bismarck, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than sixty (60) days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal. The Contractor shall also enclose within the Bid Bond envelope a copy of the bidder's North Dakota Contractor's License or a copy of their latest renewal certificate issued by the Secretary of State as per North Dakota Century Code 43-07-07 and 43-07-12. Any bid not containing this document shall not be acceptable and shall be returned to the Bidder. The successful Bidder will be required to furnish a Contract Performance Bond and Payment Bond in the full amount of the Contract. The Board of City Commissioners, Bismarck, North Dakota, reserves the right to hold all bids for a period of sixty (60) days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner. The successful Bidder will have to obtain a statement from the Office of the State Tax Commissioner showing that all taxes due and owing to the State of North Dakota have paid before the contract can be executed . The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade: 0.4% Goals for female participation in each trade: 6.9% Bid Result Schedule 1 Strata Corporation-$3,197,509 Schedule 2 Edling Electric-$202,730

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents