Similar Projects
Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

West Shore Lake Pontchartrain Site Preparation & Sand Placement Contract # 2
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Ponchatoula, LA 70454

Southwest Railroad Parking Mall (300 Block)
Infrastructure
Post-Bid
$176,000 CJ est. value
Hammond, LA 70401

LA 1063: Glendale Dr - US 51 Drainage
Infrastructure
Design
$250,000 CJ est. value
Independence, LA 70443

Full Cantilever Hip Shade
Infrastructure
Post-Bid
$35,110 CJ est. value
Hammond, LA 70403

Martin Luther King Park Parking Improvements Contract A - Asphalt
Infrastructure
Post-Bid
$172,567 CJ est. value
Hammond, LA 70401

La 22: US 51 - Dunson Rd
Infrastructure
Design
$100,000 CJ est. value
Ponchatoula, LA 70454

Amite Solar Project
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Tangipahoa, LA 70465

Water System Improvements
Infrastructure
Construction
$1,617,000 CJ est. value
Hammond, LA 70401

Pope Ln: Ic RR Xing (Amite City)
Infrastructure
Design
$500,000 CJ est. value
Amite, LA 70422

Contract B Elevated Water Tank LA40 West
Renovation, Infrastructure
Results
$2,195,950 CJ est. value
Hammond, LA 70401

I-12: US 51b (Hammond) Intchg Lighting
Infrastructure
Design
$2,500,000 CJ est. value
Hammond, LA 70403

Martha Vineyard Canopy Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Ponchatoula, LA 70454

Sewer Lift Station Improvements
Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Independence, LA 70443

Railroad Track Repairs
Infrastructure
Post-Bid
$25,000 CJ est. value
Hammond, LA 70401

Last Updated 01/19/2023 12:09 PM
Project Title

Niagara Bottling / Hammond

Physical Address View project details and contacts
City, State (County) Hammond, LA 70401   (Tangipahoa County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $160,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a water bottling facility. As of January 19, 2023, this project is in final planning. Information regarding an architect and a general contractor has not been released. A firm construction timeline has not been confirmed but it is expected to start second quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

500,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents