Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

RFP Design - Playground and Shade Structures - Coastal Sites
Infrastructure
Conception
$2,000,000 CJ est. value
Oceanside, CA 92058

Helix 9 Flow Control Facility Rotary Cone Valve
Renovation
Design
$350,000 to $450,000 est. value
San Diego, CA 92101

Construct and Upgrade Pedestrian Curb Ramps to Meet ADA Standards
Infrastructure
Design
$6,548,000 CJ est. value
San Diego, CA 92104

Quantum Information Technologies (QIT) Lab, Topside Complex
New Construction, Infrastructure - 3,600 SF
Bidding
$5,000,000 CJ est. value
San Diego, CA 92106

D-B - Repair DIPC, Dental Lab, Dental Treatment Facility Bldg
Demolition, Build-out, Renovation, Infrastructure
Bidding
$7,000,000 CJ est. value
Camp Pendleton North, CA 92058

Meadows No. 1 and Reid Hill Reservoirs Painting and Recoating Project
Infrastructure
Sub-Bidding
$1,350,000 CJ est. value
Valley Center, CA 92082

Iowa Street
Demolition, New Construction, Infrastructure - 7,005 SF
Sub-Bidding
$4,526,000 CJ est. value
San Diego, CA 92104

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Lakeside Valve Station Replacement
Renovation
Post-Bid
$2,200,000 to $2,500,000 est. value
San Diego, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

E Reservoir Replacement And Pump Station Project
New Construction
Results
$12,350,000 est. value
Vista, CA

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Asphalt and Striping Project
Infrastructure
Construction
$180,000 CJ est. value
San Diego, CA 92101

Chula Vista Bayfront Parks - Sweetwater Park
Infrastructure, Renovation
Pending Verification
$12,000,000 CJ est. value
Chula Vista, CA 91910

Last Updated 08/04/2022 01:34 PM
Project Title

Moonlight Beach Pump Station Rehabilitation - CE22D - City of Encinitas

Physical Address View project details and contacts
City, State (County) Encinitas, CA 92024   (San Diego County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Moonlight Beach Pump Station Rehabilitation A detailed scope is not available Project is included in the City of Encinitas's FY 2022-2027 CIP. As of August 4, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents