Similar Projects
2023 Woodland ELM Administration Office Remodel
Build-out
Bidding
$700,000 CJ est. value
Gages Lake, IL 60030

Summer 2021 Renovations at 8 Schools
Renovation
Post-Bid
Waukegan, IL 60085

Elementary School South - Bid Release 1A Trade Package 09E-1A Athletic Flooring
Renovation, Addition - 18,000 SF
Post-Bid
Vernon Hills, IL 60061

Summer 2022 Improvements
Renovation
Results
Lake Villa, Lindenhurst, IL 60046

2022 STEAM at Spencer Loomis ES & MS North and Isaac Fox ES & MS South - Bid Release 1
Renovation, Addition
Results
Hawthorn Woods, Lake Zurich, IL 60047

Middle School South and Aspen Elementary
Renovation, Addition - 5,110 SF
Post-Bid
Vernon Hills, IL 60061

Yard Storage Building-Oak Grove School
New Construction - 1,300 SF
Results
Libertyville, IL 60048

2022 North Chicago SD 187 School Improvements
Renovation
Post-Bid
North Chicago, IL 60064

2022 Capital Projects
Renovation
Results
Wauconda, IL

2022 STEAM Additions and Interior Renovations
Renovation, Addition
Post-Bid
Hawthorn Woods, Lake Zurich, IL 60047

D3 Summer 2022 Life Safety Improvements
Renovation
Results
Zion, IL 60099

Life Safety Improvements at Six Schools
Renovation
Post-Bid
Deerfield, IL 60015

Summer 2022 School Improvements
Renovation
Results
Highland, Libertyville, Lombard, IL 60048

District 3 Howe Howe Elementary School Improvements
Renovation
Post-Bid
$300,000 est. value
Beach Park, IL 60087

2022 Woodland Elm Administration Office Remodel
Renovation
Results
Grayslake, IL 60030

Last Updated 10/12/2022 07:05 PM
Project Title

2022 Woodland Elm Administration Office Remodel

Physical Address View project details and contacts
City, State (County) Gages Lake, IL 60030   (Lake County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,217,536 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 22, 2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet.** $503,000 6246-526-3 1. Finish surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following: a. Interior: 1) Masonry (CMU: Concrete, split face, scored, smooth, high density, low density, and fluted. 2) Metal: Structural steel columns, structural iron, and ferrous metal. 3) Drywall: Walls, ceilings, gypsum board, and similar items.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents