Similar Projects
Wastewater Treatment Plan Improvements
Renovation
Bidding
$2,686,000 est. value
New Albin, IA

Lift Station Improvements
Renovation
Post-Bid
Rockwell City, IA

Southbridge Lift Station Improvements, Bid Package No. 1 - Lift Station
New Construction, Infrastructure
Results
Less than $1,210,000 est. value
Adel, IA

Southbridge Lift Station Improvements, Bid Package No. 2 - Force Main
New Construction, Infrastructure
Results
Less than $790,000 est. value
Adel, IA 50003

Green Valley Park Campground Sewer Main
Renovation, Infrastructure
Results
Less than $560,000 est. value
Union, IA

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Post-Bid
Mount Pleasant, IA

Iowa Wastewater Treatment Facility 2021
New Construction
Post-Bid
$1,805,000 est. value
Miles, IA

USACE Cedar Lake Pump Station
Conception
$23,300,000 est. value
Cedar Rapids, IA 52407

Pump Station and Ground Storage Reservoir
New Construction, Infrastructure
Results
$1,300,000 est. value
Ashton, IA

Auburn Court Lift Station Abandonment
New Construction, Infrastructure
Results
Bettendorf, IA

Main Lift Pump Station Emergency Repairs
Renovation
Results
Davenport, IA 52802

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Grandview Booster Station Improvements
New Construction
Results
Sioux City, IA 51104

Last Updated 01/18/2022 11:54 AM
Project Title

Xenia Rural Water District Boone East Pump Station

Physical Address View project details and contacts
City, State (County) Boone, IA 50036   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, labor, and equipment necessary for excavation, backfill and sitework; cast-in-place reinforced concrete foundation and slabs, precast concrete building with standing seam metal roof, chemical feed systems, potable water booster pump system, mechanical and electrical work including power wiring, controls and instrumentation, control system integration; surface restoration; testing; startup; SWPPP management and compliance, miscellaneous associated work including cleanup and other required items

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents