Similar Projects
Construction of Diamante Well
Infrastructure
Bidding
Daphne, AL

Pintlala Water System - Deep Water Production Well and Meter Reading System Replacement
Alteration
Bidding
Hope Hull, AL

Contract 1 - Test Well and Gravel Filter Finish Production Well (Well No. 6 - Red Springs Well)
Post-Bid
Gilbertown, AL

New Water Supply Well on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,200,000 est. value
Brewton, AL 36426

Consecutive Replacement of Wells #1 and #8
Results
Fairhope, AL 36533

Well Abandonment Services for Iron Well on South Ingleside Street
Results
Less than $34,000 est. value
Fairhope, AL 36532

Replacement of Wells 2 and 9
Infrastructure
Bidding
Fairhope, AL 36532

Water Supply Improvements (Contract B)
Post-Bid
Irvington, AL 36544

Primary Solids Handling Pump Modifications for Hilliard Fletcher Wastewater Treatment Plant
Results
Less than $576,836 est. value
Tuscaloosa, AL

Diagnose/Repair- Molnar/Houston/Upland
Post-Bid
Eufaula, AL 36027

Rehabilitation of Shellfield Road Well No. 11
Results
Less than $73,140 est. value
Enterprise, AL

Sewer Lift Station Motor/Valve Repairs - O`Rourke Elementary School
Post-Bid
Mobile, AL 36695

Alexander City Adams WTP Vertical Turbine High Service Pump
Results
Alexander City, AL

Water Meter Replacement and Pumping Stations Upgrade
Post-Bid
Gordon, AL 36343

Double Diaphragm Pump
Results
Less than $33,500 est. value
Orange Beach, AL 36561

Last Updated 07/22/2021 01:56 PM
Project Title

Construction of the Water Production Well 2

Physical Address View project details and contacts
City, State (County) Sylacauga, AL   (Talladega County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major components: Installation of a water production well including but not limited to removal of existing test well casing, drilling of production well, installation of casing and screen, test pumping, and water quality analysis.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents