Similar Projects
Last Updated | 06/25/2021 08:31 AM |
Project Title | 2021 Street and Utility Improvements |
Physical Address | View project details and contacts |
City, State (County) | New Richmond, WI 54017 (Saint Croix County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Major Quantities on the Project Include: 1 LS Maintenance of Traffic 5,300 CY Common Excavation 960 CY Salvage, Stockpile, and Replace Pulverized Base 4,000 Ton Crushed Aggregate Base Course, 1-1/4 inch 950 Ton Asphaltic Pavement 3,700 LF Concrete Curb and Gutter, 30-inch Type D 5,100 SF Concrete Sidewalk 4-inch 2,850 SF Concrete Sidewalk or Driveway, 6-inch 8,500 SY Turf Establishment 1,650 LF 8-inch DIP Water Main 5 Each Hydrant 800 LF 1-inch Copper Water Service 1,100 LF 8-inch PVC Sanitary Sewer 700 LF 18-inch PVC Sanitary Sewer 9 Each Sanitary Sewer Manhole, 48-inch 800 LF 4-inch PVC Sanitary Sewer Service Pipe 1,600 LF RCP Storm Sewer (12-inch thru 30-inch) 6 Each Storm Sewer Manhole, Type B 14 Each Inlet, Type 3 The project includes the following streets: S Pierson Ave, E 8th Street and Riley Avenue. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |