Similar Projects
Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Base of Stairwell Repair at Prosser High School
Post-Bid
Chicago, IL 60602

2020 Water Pumping Station Exterior Facade Restoration
Results
$84,000 est. value
Homewood, IL 60430

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

Infiltration and Tuckpointing at Schurz
Post-Bid
Chicago, IL 60641

Reglaze Curtain Wall
Results
Less than $5,000,000 est. value
Chicago, IL 60652

Curtainwall Replacement at Lincoln MS
Post-Bid
Schiller Park, IL 60176

Sullivan HS Mechanical Room Steel Staircase Replacement
Results
Chicago, IL 60626

2021 Wall Life Safety and Exterior Stairs
Post-Bid
Palatine, IL

2021 Train Station Grade Stair Demolition and Replacement
Demolition
Results
Palatine, IL

Hamlin Storefront Replacement
Post-Bid
Alsip, IL 60803

CPS Curie HS Gym Wall Removal and Installation of Vinyl Curtains (VT Pool)
Results
Chicago, IL 60632

Sunrise Apartments Steel Staircases and Platforms
Term Contract
Post-Bid
Chicago Heights, IL 60411

Harold Washington College Restore Exterior
Alteration
Results
$2,000,000 est. value
Chicago, Springfield, IL 60601

Swallow Cliff Stairs Rehabilitation
Term Contract
Post-Bid
IL

Last Updated 09/17/2021 08:17 AM
Project Title

CHA Vivian Gordon-Harsh Exterior

Physical Address View project details and contacts
City, State (County) Chicago, IL 60653   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Envelope: Roof Total replacement to include associated roofing components, repairs, and /or modifications. Facade restoration includes brick masonry, concrete, lintels, sealant repair, replacement and/or modifications. Construction of new building front entry vestibule, building rear electrical/storage addition, interior electrical room and select 1st floor opening enlargements with window replacement. 2. Civil: includes select utility infrastructure work required for; new rear addition that includes generator, transformer and ATT utility underground connection scopes, relocation of water service at front of building and select underground sanitary repair and replacement. 3. Site Improvements: Reconfigure and construct new entry walkway accessible street drop-off and make other site improvements including but not limited to new site lighting, furniture, landscaping and required site restoration work from sewer line replacement work.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents