Similar Projects
Sun Communities Mobile Home Park
New Construction
Conception
Fort Collins, CO 80525

Westwood Subdivision Site Development
New Construction
Design
Thornton, CO 80602

Poudre Learning Center-Hall133, Riparian Restoration
Renovation
Design
Greeley, CO 80631

PKAA Chicago In Spring Mine Closure Project, 709N
Bidding
Denver, CO

Sky Ranch Cab Filing 4 Wet Utilities Project
Bidding
Lakewood, CO 80227

PKAA, Todd Gulch Mine Closure Project #653E
Post-Bid
Denver, CO

Pkaa, Fy2020, Mesa County Coal Refuse Project (572E)
Post-Bid
CO

PKAA, Monte Cristo Project Osm #715N
Results
Less than $97,740 est. value
Denver, CO

Boat Ramps and Two Parts of the Trail Extension
Results
Denver, CO

Avilla Prairie Center
New Construction
Construction
Brighton, CO 80601

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Waterglen Pud Multi-Family
New Construction - 9,950 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Collins, CO 80524

Berthoud Commons
New Construction
Pending Verification
Berthoud, CO 80513

Deer Creek Villas
New Construction
Design
Littleton, CO

PKAA Bald Mountain Mine Closure Project
Bidding
Denver, CO

Last Updated 11/17/2020 10:03 AM
Project Title

2021 Annual Power Division Directional Bore Projects

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City is seeking to prequalify contractors for one or both of the following: 1. Prequalify contractors to bid on an indefinite delivery contract (IDC) valued at $900,000 to provide an indefinite quantity of predefined directional boring services for a period of one year. The City may request to renew this contract for up to four (4) additional oneyear periods using the Denver consumer price index for possible adjustments each year. The City uses the IDC for directional boring services on projects that are generally smaller in scope. The IDC is not intended to cover large-scale and capital project work. The City intends to award this bid to the lowest responsible, pre-qualified contractor that, in the City’s judgment, will best serve the City’s interests. Payment and Performance bonds for 100% of the contract amount will be required for contract. 2. Prequalify contractors to bid on directional boring services for large projects. This will allow the City to quickly solicit competitive bids from among pre-qualified contractors for directional boring projects that are either unique or complicated due to their size, configuration, or location and fall outside of the IDC scope and requirements. The general conditions, scope of work (SOW) and technical specifications for each project will be detailed in the bid documents issued to the pre-qualified contractors. The City intends to award each project to the lowest responsible, responsive pre-qualified contractor that, in the City’s judgement, will best serve the City’s interests. City shall consider the contractors identified through Part 2 of this SOQ to be pre-qualified for a period of 5 years.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents