Similar Projects
Elections Complex - Buncombe County
New Construction, Infrastructure
Conception
$17,751,479 CJ est. value
Asheville, NC 28805

Sulphur Springs Road Construction - City of Asheville
Infrastructure
Conception
$1,200,000 CJ est. value
Asheville, NC 28806

Sardis Road Apartments
New Construction, Infrastructure
Design
$112,000,000 CJ est. value
Asheville, NC 28806

Woodland Development
New Construction, Infrastructure
Design
$27,000,000 CJ est. value
Asheville, NC 28806

Veterans Park Streambank Restoration
Infrastructure
Bidding
$363,950 CJ est. value
Black Mountain, NC 28711

Veterans Park Streambank Restoration
Infrastructure
Bidding
$363,950 CJ est. value
Black Mountain, NC 28711

Fairview Volunteer Fire Department Renovations and Additions - GMP
Addition, Demolition, Renovation, Infrastructure - 25,316 SF
Sub-Bidding
$4,000,000 CJ est. value
Fairview, NC 28730

Helpmate Domestic Violence - Civil Package
New Construction, Infrastructure - 22,000 SF
Sub-Bidding
$12,000,000 CJ est. value
Asheville, NC 28801

Reed Creek Mixed Use Development
New Construction, Infrastructure - 49,264 SF
Post-Bid
$20,000,000 CJ est. value
Asheville, NC 28801

Army Reserve Center
New Construction, Infrastructure - 31,637 SF
Post-Bid
$25,000,000 CJ est. value
East Flat Rock, NC 28726

Campus Roadway Repairs
Infrastructure
Results
$3,116,884 CJ est. value
Asheville, NC 28804

Roberts Road Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$334,000 CJ est. value
Asheville, NC 28803

Long Shoals Road Multifamily
New Construction, Infrastructure
Construction
$33,000,000 CJ est. value
Arden, NC 28704

W.D. Williams Elementary School, Classroom and Media Center Additions
Addition, Demolition, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Swannanoa, NC 28778

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Last Updated 02/20/2024 02:06 PM
Project Title

RFQ D/B - North Bank Swannanoa River Floodbench and Constructed Wetlands

Physical Address View project details and contacts
City, State (County) Black Mountain, NC 28711   (Buncombe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town is seeking Responses from design-build teams to complete assessment, design, permitting, conservation easement documentation, and construction at two sites along a roughly 3300-linear-foot reach of the Swannanoa River. The sites were identified in the Town's Stormwater Master Plan Update (2022) as providing opportunities to mitigate flooding and improve water quality in the watershed. The proposed Project will reduce flood risks and address water quality issues downstream and is NOT to repair or improve transportation infrastructure. The proposed Project area encompasses two (2) sites along an approximate 3,300 linear-foot reach of the Swannanoa River as further described below. The sites were identified in the Town's Stormwater Master Plan Update (2022) as providing opportunities to mitigate flooding and improve water quality in the watershed. Both Project sites are wooded and include underground utilitiessuch as natural gas and sanitary sewer lines. Consideration must be given to protection of beneficial riparian vegetation, improving buffers where appropriate, and avoiding utility impacts. Any questions regarding this RFQ/P must be received in writing via email prior to February 5, 2024, by 2:00 p.m. EST. Questions received after this date may not receive a response. Questions should be directed via email to the contact identified in Section VI. The total budget for all design-build services for the aforementioned Project has not been established. However, it is anticipated that the Project budget will not exceed $5 million. The State will determine the final amount of funding based on the final scope of work submitted, with the total grant not to exceed $5,000,000.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents